Multi-Year Tariff Regulations, 2016 — Second Amendment, 2018 — Statement of Reasons

Gujarat Electricity Regulatory Commission (Multi-Year Tariff) (Second Amendment) Regulations, 2018

Statement of reasonsDated 14 Aug 2018

Replaced by Gujarat Multi-Year Tariff Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Multi-Year Tariff Regulations, 2016 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Statement of Reasons for the GERC (Multi-Year Tariff) (Second Amendment) Regulations, 2018, signed at Gandhinagar on 14/08/2018 (p8). Section 1 (pp1–3) sets out the background: the principal GERC (MYT) Regulations, 2016 (Notification No. 4 of 2016); the Commission's tariff order of 31 March 2017 in Petition No. 1620 of 2016, which fixed short-term transmission charges on a per-MW-per-day basis for bilateral short-term open access and on a per-kWh basis for collective transactions through power exchanges; GETCO's petition 1692 of 2017 and the tariff order of 31 March 2018; and stakeholder representations asking for uniform short-term transmission charges. It records the draft amendment and explanatory note, newspaper notices in Mint, Sandesh and Gujarat Samachar (27–28 April 2018), posting on the Commission's website, and the public hearing of 28 June 2018 (p2).

Section 2 (pp3–8) records the written objectors — FOKIA, FGI, Torrent Power, IEX and GUVNL — plus GETCO and SLDC at the hearing, summarises each objection (the jump in bilateral STOA charges, the case for incentivising bilateral contracts, retrospective recovery concerns, preference for an allocated-capacity rather than energy-wheeled basis, and a pending High Court matter) and gives the Commission's view on each: it treats uniformity across all STOA transactions, on par with the CERC sharing framework, as the governing rationale.

Section 3 records the decision that the draft Second Amendment be published in the Official Gazette, and Section 4 is the order clause (p8). The amended text itself is not in this document.

Standard name
Multi Year Tariff Regulations
Primary topics
Open access, Transmission tariff

Read with this

The regulation

Proposed changes (drafts with no final yet)

4 more documents belong here and are not on Voltaic: 3 copies in another language and 1 procedure or order made under it not held as English text.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document