Skip to content

GERC · Gujarat Electricity Regulatory Commission

Multi-Year Tariff Regulations, 2016 — Second Amendment, 2018 — Draft

Gujarat Electricity Regulatory Commission (Multi-Year Tariff) (Second Amendment) Regulations, 2018

Draft amendmentDated 26 Apr 2018Notification No. ….. of 2018 dated 26/04/2018

Draft

A proposal that has since been finalised as the Multi-Year Tariff Regulations, 2016 — Second Amendment, 2018.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This two-page draft instrument is the GERC's proposed second amendment to its 2016 Multi-Year Tariff Regulations (p1). It cites the Electricity Act, 2003 and the Gujarat Electricity Industry (Reorganisation and Regulation) Act, 2003 as its legal basis, extends to the whole State of Gujarat, and says it will come into force on publication in the Official Gazette (p1).

Its substantive change is to Regulation 72. Regulations 72.2 and 72.3 are replaced by a single Regulation 72.2 that sets transmission charges for short-term users, including collective transactions through power exchanges, in Rs/kWh using Transmission ARR divided by total units wheeled (p1–2). The inserted clause defines Transmission ARR by reference to Regulation 68 of the principal Regulations and defines total units wheeled as total energy input into the intra-State transmission system during the financial year (p2).

Regulation 3 then renumbers Regulation 72.4 as Regulation 72.3 (p2). The document is signed by the Commission Secretary at Gandhinagar on 26/04/2018 (p2); because it is a draft and the notification number and Gazette date are blank, no effective date is fixed in the text.

Standard name
Multi Year Tariff Regulations
Primary topics
Transmission tariff

Read with this

The regulation

Commencement notices and reasons

Proposed changes (drafts with no final yet)

4 more documents belong here and are not on Voltaic: 3 copies in another language and 1 procedure or order made under it not held as English text.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document