Draft Multi Year Tariff Regulations, 2021 — Explanatory Memorandum

EXPLANATORY MEMORANDUM ON DRAFT GUJARAT ELECTRICITY REGULATORY COMMISSION (MULTI YEAR TARIFF) REGULATIONS, 2021

Explanatory memorandum to a draftDated 10 Aug 2020

Draft

Voltaic holds no final regulation made from this draft.

Explanatory memorandum to the draft Gujarat (Multi-Year Tariff) Regulations, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Gujarat Electricity Regulatory Commission (GERC) issued this Explanatory Memorandum on 10 August 2020 (p1) to explain the rationale for the draft GERC (Multi Year Tariff) Regulations, 2021. It is not the operative regulation: it accompanies the draft and reproduces proposed clauses, comparing them with the GERC MYT Regulations, 2016. Its central proposal is to continue a five-year Multi-Year Tariff framework for the fourth Control Period from 1 April 2021 to 31 March 2026 (p11, p13, p27). The document is organised in the same sequence as the draft.

Chapter 1 sets out the legal background under the Electricity Act 2003, the National Electricity Policy and Tariff Policy, and CERC's 2019 Tariff Regulations, explaining that the Commission has adopted CERC principles with modifications (p9–12). Chapter 2 covers preliminary provisions: it proposes a five-year control period and a revised set of definitions, including new or amended definitions for accounting statement (IND AS reconciliation), additional capital expenditure and capitalisation, base rate (SBI one-year MCLR), beneficiary, change in law (excluding O&M-related taxes), competitive bidding, contracted capacity, cut-off date, de-commissioning, DPR and non-DPR schemes, force majeure (including pandemic and non-attributable statutory delay), GCV as received basis, Index Esc, plant availability factor, transmission capacity rights and wheeling (p13–26). It also explains the proposed “deviation from norms” clause, under which the determined tariff is a ceiling and a generating company may charge a lower tariff subject to conditions and no future recovery of the revenue loss (p25–26).

Chapter 3 explains the general principles: continuation of the MYT framework, accounting and filing, controllable and uncontrollable factors, and the gain/loss sharing mechanism, with a proposed higher share of controllable gains passed to consumers while retaining the existing sharing of controllable losses (p27–29).

Chapter 4 details financial principles. It proposes revised capital cost and additional capitalisation rules, in-principle approval for major capex schemes through DPRs, a cap on non-DPR capitalisation, treatment of change-in-law/force-majeure costs, revised emission norms, PAT and sewage treatment capex, and insurance-proceeds treatment (p30–39). It retains a normative debt:equity ratio for tariff purposes and sets out return on equity, splitting RoE into a base and performance-linked component for generation, transmission, SLDC and distribution, with additional RoE linked to ramp rate, transmission availability, wire availability, collection efficiency and SCADA/website availability (p41–47). It covers interest and finance charges, refinancing gains, depreciation, interest on working capital and income-tax grossing-up (p47–54).

Chapter 5 is the largest. It explains generation tariff for conventional stations of GSECL and TPL-G, station-wise applicability, petition and provisional/final tariff timelines, the Fuel Utilisation Plan, components of tariff (annual capacity charges and energy charges), renovation and modernisation, infirm power, non-tariff income, thermal operating norms (plant availability, station heat rate, secondary fuel oil consumption, auxiliary consumption, transit and handling losses), O&M expenses using WPI/CPI indexation with station-category weightages, hydro norms, computation and payment of capacity and energy charges, deviation charges, and compensation for backing down (p55–120). It includes detailed tables comparing past actuals with proposed norms.

Chapter 6 covers intra-state transmission for GETCO: applicability, tariff components, capital investment plan, target availability, ARR, O&M norms per bay and ckt-km with WPI/CPI indexation, contingency reserve restrictions and transmission-loss treatment (p121–141). Chapter 7 covers SLDC: capital investment plan, levy and collection of charges, O&M expenses, RLDC/WRPC charges, ULDC and SCADA upgradation charges, and the LDC Development Fund (p142–153). Chapter 8 covers distribution: the wires and retail supply businesses, ARR components, O&M principles, separation/allocation of accounts, capital investment plans, non-tariff income, income from other business, power procurement and additional procurement, sales forecast and the FPPPA mechanism (p154–178).

The memorandum is mainly a rationale and consultation document for the proposed 2021 MYT framework; final values, norms and K factors are largely left to the MYT Order.

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, Generation tariff

Read with this

The regulation

Commencement notices and reasons

Proposed changes (drafts with no final yet)

4 more documents belong here and are not on Voltaic: 3 copies in another language and 1 procedure or order made under it not held as English text.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document