GERC · Gujarat Electricity Regulatory Commission
Multi-Year Tariff Regulations, 2023 — Draft
Gujarat Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2023
Draft regulationDated 4 Sep 2023
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The draft Gujarat Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2023 (p1) are the Commission's proposed five-year tariff framework for Gujarat. They are made under the Electricity Act, 2003 and the Gujarat Electricity Industry (Reorganisation and Regulation) Act, 2003 (p9), and are to apply to generation companies supplying under section 62, transmission licensees, distribution licensees and the SLDC for ARR, tariff and SLDC fees and charges from 1 April 2024 to 31 March 2029 (p10). The regulations are to come into force on Gazette publication and remain in force until 31 March 2029 unless reviewed or extended; they supersede the 2016 MYT Regulations, while earlier periods remain under the 2005, 2011 and 2016 regulations (p10).
Chapters 1-2 set definitions, scope, ceiling-norm and deviation principles, and the MYT process: filings, control-period forecasts, mid-term review, annual truing-up, separation of controllable and uncontrollable factors, sharing of gains and losses, tariff orders, and subsidy handling (p10-31, p32-47). Chapter 3 sets financial principles for capital cost, additional capitalisation, consumer contributions, debt-equity, interest, security deposits, return on equity including performance-linked additional RoE, return on capital employed for assets capitalised on or after 1 April 2024, depreciation, working capital interest, income tax, rebate, delayed payment surcharge and foreign-exchange variation (p48-83).
Chapter 4 covers generation tariff: filing requirements, capital investment and fuel-utilisation plans, tariff components, annual capacity charges, renovation and modernisation, infirm power, non-tariff income, operating norms for thermal and hydro stations, O&M norms, capacity and energy charge computation, declared-capacity demonstration, billing, CDM benefit sharing, deviation charges and backing-down compensation (p84-122). Chapter 5 covers intra-state transmission: applicability, TBCB versus regulated tariff, tariff components, capital investment, operating norms, ARR components, O&M norms, contingency reserve, non-tariff income, transmission charges and sharing, losses, open access, pricing and Government of India scheme impacts (p123-136).
Chapter 6 deals with SLDC fees and charges: applicability, capital investment, levy and collection, O&M, non-tariff income, RLDC/WRPC and ULDC/SCADA charges, determination and billing, grid connection and the LDC development fund (p137-145). Chapter 7 covers the distribution wires business: applicability, ARR components, O&M, contingency reserve, allocation matrix for separating wires and retail supply, capital investment, non-tariff income, other business income, wheeling charges and wheeling losses (p146-156). Chapter 8 covers retail supply: ARR and tariff components, transmission and SLDC charges, O&M, bad debts, capital investment, sales and demand forecasting, power procurement plans and approvals, non-tariff income, cross-subsidy and additional surcharge, distribution losses, tariff determination and the FPPAS mechanism (p157-179).
Annexures provide the depreciation schedule (p180-181), the procedure and format for transmission availability certification (p182-185), the capital expenditure approval framework with DPR and in-principle approval thresholds and prudence check (p186-201), and guidelines for allocating distribution assets and costs between wires, supply and voltage levels (p202-208).
Read with this
The regulation
- Dated 27 Mar 2016Multi-Year Tariff Regulations, 2016
Amendments and corrections
- Dated 1 Dec 2016Multi-Year Tariff Regulations, 2016 — First Amendment, 2016
- Dated 14 Aug 2018Multi-Year Tariff Regulations, 2016 — Second Amendment, 2018
Commencement notices and reasons
Proposed changes (drafts with no final yet)
- Dated 10 Aug 2020Draft Gujarat (Multi-Year Tariff) Regulations, 2021
- Dated 10 Aug 2020Explanatory memorandum: Draft Multi Year Tariff Regulations, 2021 — Explanatory Memorandum
Earlier drafts
- Dated 19 Feb 2016Multi-Year Tariff Regulations, 2016 — Draft
- Dated 30 Aug 2016Explanatory Note for Draft Multi-Year Tariff (First Amendment) Regulations, 2016
- Dated 26 Apr 2018Multi-Year Tariff Regulations, 2016 — Second Amendment, 2018 — Draft
- Dated 25 Apr 2018Explanatory memorandum: Multi-Year Tariff (Second Amendment) Regulations, 2018 — Explanatory Note — Draft
4 more documents belong here and are not on Voltaic: 3 copies in another language and 1 procedure or order made under it not held as English text.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.