Skip to content

GERC · Gujarat Electricity Regulatory Commission

Multi-Year Tariff Regulations, 2023 — Draft

Gujarat Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2023

Draft regulationDated 4 Sep 2023

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The draft Gujarat Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2023 (p1) are the Commission's proposed five-year tariff framework for Gujarat. They are made under the Electricity Act, 2003 and the Gujarat Electricity Industry (Reorganisation and Regulation) Act, 2003 (p9), and are to apply to generation companies supplying under section 62, transmission licensees, distribution licensees and the SLDC for ARR, tariff and SLDC fees and charges from 1 April 2024 to 31 March 2029 (p10). The regulations are to come into force on Gazette publication and remain in force until 31 March 2029 unless reviewed or extended; they supersede the 2016 MYT Regulations, while earlier periods remain under the 2005, 2011 and 2016 regulations (p10).

Chapters 1-2 set definitions, scope, ceiling-norm and deviation principles, and the MYT process: filings, control-period forecasts, mid-term review, annual truing-up, separation of controllable and uncontrollable factors, sharing of gains and losses, tariff orders, and subsidy handling (p10-31, p32-47). Chapter 3 sets financial principles for capital cost, additional capitalisation, consumer contributions, debt-equity, interest, security deposits, return on equity including performance-linked additional RoE, return on capital employed for assets capitalised on or after 1 April 2024, depreciation, working capital interest, income tax, rebate, delayed payment surcharge and foreign-exchange variation (p48-83).

Chapter 4 covers generation tariff: filing requirements, capital investment and fuel-utilisation plans, tariff components, annual capacity charges, renovation and modernisation, infirm power, non-tariff income, operating norms for thermal and hydro stations, O&M norms, capacity and energy charge computation, declared-capacity demonstration, billing, CDM benefit sharing, deviation charges and backing-down compensation (p84-122). Chapter 5 covers intra-state transmission: applicability, TBCB versus regulated tariff, tariff components, capital investment, operating norms, ARR components, O&M norms, contingency reserve, non-tariff income, transmission charges and sharing, losses, open access, pricing and Government of India scheme impacts (p123-136).

Chapter 6 deals with SLDC fees and charges: applicability, capital investment, levy and collection, O&M, non-tariff income, RLDC/WRPC and ULDC/SCADA charges, determination and billing, grid connection and the LDC development fund (p137-145). Chapter 7 covers the distribution wires business: applicability, ARR components, O&M, contingency reserve, allocation matrix for separating wires and retail supply, capital investment, non-tariff income, other business income, wheeling charges and wheeling losses (p146-156). Chapter 8 covers retail supply: ARR and tariff components, transmission and SLDC charges, O&M, bad debts, capital investment, sales and demand forecasting, power procurement plans and approvals, non-tariff income, cross-subsidy and additional surcharge, distribution losses, tariff determination and the FPPAS mechanism (p157-179).

Annexures provide the depreciation schedule (p180-181), the procedure and format for transmission availability certification (p182-185), the capital expenditure approval framework with DPR and in-principle approval thresholds and prudence check (p186-201), and guidelines for allocating distribution assets and costs between wires, supply and voltage levels (p202-208).

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, ARR and true-up

Read with this

The regulation

Commencement notices and reasons

Proposed changes (drafts with no final yet)

4 more documents belong here and are not on Voltaic: 3 copies in another language and 1 procedure or order made under it not held as English text.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document