GERC · Gujarat Electricity Regulatory Commission
Multi-Year Tariff Regulations, 2016 — Second Amendment, 2018
Gujarat Electricity Regulatory Commission (Multi-Year Tariff) (Second Amendment) Regulations, 2018
AmendmentDated 14 Aug 2018Published in the Gazette 18 Aug 2018Notification No. 2 of 2018 dated 14/08/2018
Replaced by Gujarat Multi-Year Tariff Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Multi-Year Tariff Regulations, 2016.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Second Amendment to the GERC (Multi-Year Tariff) Regulations, 2016 (No. 4 of 2016), issued by the Gujarat Electricity Regulatory Commission as Notification No. 2 of 2018 and published in the Gujarat Government Gazette (Extraordinary, Part IV-C) on 18 August 2018; the signed order is dated 14 August 2018 (p1–2). It applies across the whole State of Gujarat and comes into force on the date of gazette publication (p1).
The operative change is narrow. Regulations 72.2 and 72.3 of the principal regulations are substituted by a single new Regulation 72.2, which sets out how transmission charges for short-term users — including collective transactions through power exchanges — are to be determined, expressed as a rate in Rs. per kWh derived from the Transmission ARR divided by total units wheeled, with the ARR to be determined under Regulation 68 and units defined as energy input into the intra-State transmission system over the financial year (p1–2).
Regulation 72.4 of the principal regulations is then renumbered as Regulation 72.3, consequential on collapsing the two prior sub-regulations into one (p2).
Read with this
The regulation
- Dated 27 Mar 2016Multi-Year Tariff Regulations, 2016
Amendments and corrections
- Dated 1 Dec 2016Multi-Year Tariff Regulations, 2016 — First Amendment, 2016
Commencement notices and reasons
Proposed changes (drafts with no final yet)
- Dated 10 Aug 2020Draft Gujarat (Multi-Year Tariff) Regulations, 2021
- Dated 10 Aug 2020Explanatory memorandum: Draft Multi Year Tariff Regulations, 2021 — Explanatory Memorandum
- Dated 4 Sep 2023Multi-Year Tariff Regulations, 2023 — Draft
Earlier drafts
- Dated 19 Feb 2016Multi-Year Tariff Regulations, 2016 — Draft
- Dated 30 Aug 2016Explanatory Note for Draft Multi-Year Tariff (First Amendment) Regulations, 2016
- Dated 26 Apr 2018Multi-Year Tariff Regulations, 2016 — Second Amendment, 2018 — Draft
- Dated 25 Apr 2018Explanatory memorandum: Multi-Year Tariff (Second Amendment) Regulations, 2018 — Explanatory Note — Draft
4 more documents belong here and are not on Voltaic: 3 copies in another language and 1 procedure or order made under it not held as English text.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.