Multi-Year Tariff Regulations, 2016 — Second Amendment, 2018

Gujarat Electricity Regulatory Commission (Multi-Year Tariff) (Second Amendment) Regulations, 2018

AmendmentDated 14 Aug 2018Published in the Gazette 18 Aug 2018Notification No. 2 of 2018 dated 14/08/2018

Replaced by Gujarat Multi-Year Tariff Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Multi-Year Tariff Regulations, 2016.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Second Amendment to the GERC (Multi-Year Tariff) Regulations, 2016 (No. 4 of 2016), issued by the Gujarat Electricity Regulatory Commission as Notification No. 2 of 2018 and published in the Gujarat Government Gazette (Extraordinary, Part IV-C) on 18 August 2018; the signed order is dated 14 August 2018 (p1–2). It applies across the whole State of Gujarat and comes into force on the date of gazette publication (p1).

The operative change is narrow. Regulations 72.2 and 72.3 of the principal regulations are substituted by a single new Regulation 72.2, which sets out how transmission charges for short-term users — including collective transactions through power exchanges — are to be determined, expressed as a rate in Rs. per kWh derived from the Transmission ARR divided by total units wheeled, with the ARR to be determined under Regulation 68 and units defined as energy input into the intra-State transmission system over the financial year (p1–2).

Regulation 72.4 of the principal regulations is then renumbered as Regulation 72.3, consequential on collapsing the two prior sub-regulations into one (p2).

Standard name
Multi Year Tariff Regulations
Primary topics
Transmission tariff, Open access charges, Power markets and exchanges

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Proposed changes (drafts with no final yet)

4 more documents belong here and are not on Voltaic: 3 copies in another language and 1 procedure or order made under it not held as English text.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.