CERC · Central Electricity Regulatory Commission
Procedure on Maintenance and Testing of Communication System under the Communication System for inter-State transmission of electricity Regulations, 2017 — Approval Order, 2024
Approval of Procedure on "Procedure on Maintenance and testing of Communication System" under the Central Electricity Regulatory Commission (Communication System for inter-State transmission of electricity) Regulations, 2017.
ProcedureDated 19 Jan 2024No.- L-1/210/2016/CERC dated 19 th January, 2024
Made under the Communication System for inter-State Transmission of Electricity Regulations, 2017.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Commission's order of 19 January 2024 approves, after incorporating its own changes, the Procedure on Maintenance and Testing of Communication System that CTU prepared under Regulation 9 of the CERC (Communication System for inter-State transmission of electricity) Regulations, 2017; CTU's three submission letters and the stakeholder consultation are recorded (p1–2). The Procedure itself, dated January 2024, is annexed and runs from p3 to p51.
It applies to communication infrastructure used for power system operation on the inter-State transmission system and, until their own SERCs frame communication regulations, on intra-State transmission systems. It binds all "Users" — generating companies including captive plants, RE generators, transmission and distribution licensees, bulk consumers connected to ISTS/State transmission, SLDCs, RLDCs, NLDC, CTUIL, STUs, RPCs, REMC, FSPs and power exchanges (p5).
The Procedure sets out the component map — communication media (OPGW, UG fibre, ADSS, approach cable, VSAT), communication equipment with cabling (SDH/PDH, NMS), auxiliary DC power supply and batteries, and auxiliary infrastructure (repeater shelters, air conditioning, DG sets) (p6) — then allocates responsibility between owner/user nodal officers and CTU's Network Monitoring Teams, and defines the resource categories of maintenance teams, T&P/spares and site documents (p6–9).
For each asset class it specifies what to inspect, the periodicity of patrolling, preventive/predictive and scheduled maintenance, test set-ups and acceptance criteria, breakdown-maintenance steps, post-restoration reporting, quarterly testing of redundant data-reporting channels, cyber-security expectations, and documentation and reporting duties (p10–41). Later sections cover safety, disaster management, quarterly maintenance meetings chaired by CTU, and CTU-led revision of the Procedure with Commission approval (p42–44). Six annexures supply the escalation matrix, a typical T&P and test-equipment list, and blank record/report formats (p45–51).
Read with this
The regulation
Commencement notices and reasons
Procedures and orders made under it
- Dated 19 Jan 2024Centralized Supervision for Quick Fault Detection and Restoration Procedure, 2024 — Approval Order under Communication System Regulations, 2017
- Dated 19 Jan 2024Guidelines on Availability of Communication System, 2024
- Dated 19 Jan 2024Guidelines on Interfacing Requirements under the Communication System for inter-State Transmission of Electricity Regulations, 2017
Earlier drafts
- Released with the notice dated 7 Sep 2016Communication System for inter-State Transmission of Electricity Regulations, 2016 — Draft
- Dated 7 Sep 2016Public notice: Communication System for inter-State Transmission of Electricity Regulations, 2016 — Public Notice — Draft
- Released with the notice dated 7 Sep 2016Explanatory memorandum: Draft Communication System for inter-State Transmission of Electricity Regulations, 2016 — Explanatory Memorandum
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.