Procedure on Maintenance and Testing of Communication System under the Communication System for inter-State transmission of electricity Regulations, 2017 — Approval Order, 2024

Approval of Procedure on "Procedure on Maintenance and testing of Communication System" under the Central Electricity Regulatory Commission (Communication System for inter-State transmission of electricity) Regulations, 2017.

ProcedureDated 19 Jan 2024No.- L-1/210/2016/CERC dated 19 th January, 2024

Made under the Communication System for inter-State Transmission of Electricity Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Commission's order of 19 January 2024 approves, after incorporating its own changes, the Procedure on Maintenance and Testing of Communication System that CTU prepared under Regulation 9 of the CERC (Communication System for inter-State transmission of electricity) Regulations, 2017; CTU's three submission letters and the stakeholder consultation are recorded (p1–2). The Procedure itself, dated January 2024, is annexed and runs from p3 to p51.

It applies to communication infrastructure used for power system operation on the inter-State transmission system and, until their own SERCs frame communication regulations, on intra-State transmission systems. It binds all "Users" — generating companies including captive plants, RE generators, transmission and distribution licensees, bulk consumers connected to ISTS/State transmission, SLDCs, RLDCs, NLDC, CTUIL, STUs, RPCs, REMC, FSPs and power exchanges (p5).

The Procedure sets out the component map — communication media (OPGW, UG fibre, ADSS, approach cable, VSAT), communication equipment with cabling (SDH/PDH, NMS), auxiliary DC power supply and batteries, and auxiliary infrastructure (repeater shelters, air conditioning, DG sets) (p6) — then allocates responsibility between owner/user nodal officers and CTU's Network Monitoring Teams, and defines the resource categories of maintenance teams, T&P/spares and site documents (p6–9).

For each asset class it specifies what to inspect, the periodicity of patrolling, preventive/predictive and scheduled maintenance, test set-ups and acceptance criteria, breakdown-maintenance steps, post-restoration reporting, quarterly testing of redundant data-reporting channels, cyber-security expectations, and documentation and reporting duties (p10–41). Later sections cover safety, disaster management, quarterly maintenance meetings chaired by CTU, and CTU-led revision of the Procedure with Commission approval (p42–44). Six annexures supply the escalation matrix, a typical T&P and test-equipment list, and blank record/report formats (p45–51).

Primary topics
Communication and SCADA, Cyber security

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.