CERC · Central Electricity Regulatory Commission
Communication System for inter-State Transmission of Electricity Regulations, 2016 — Draft
Central Electricity Regulatory Commission (Communication System for inter-State transmission of electricity) Regulations, 2016
Draft regulationReleased with the notice dated 7 Sep 2016File No. L-1/210/2016/CERC
Draft
A proposal that has since been finalised as the Communication System for inter-State Transmission of Electricity Regulations, 2017.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Central Commission's draft principal regulation for the communication systems that carry voice, video, data and tele-protection traffic for inter-State transmission of electricity (p1–2). It applies to the communication infrastructure used for power-system communication and binds all Users, SLDCs, RLDCs, NLDC, CEA, CTU, STUs, RPCs, Renewable Energy Management Centres, forecasting service providers and power exchanges (p6). Clauses 1–3 give the title and gazette-publication commencement and lay down the vocabulary for communication systems and networks, data, SCADA, PMU, RTU, commercial operation date, forecasting service providers, and who qualifies as a 'User' or 'Requester' (p2–5).
Clauses 4–7 set the objective, scope and nodal-agency design, then allocate responsibilities: CEA formulates planning criteria, technical standards and cyber-security requirements and constitutes a Standing Committee on Communication; CTU plans the national backbone and cross-border communication in consultation with CEA, STUs, ISGS, IPPs, RPCs, NLDC and RLDCs; STUs do the same within States and must give users access to their wideband network; NLDC, RLDC and SLDC act as integration nodal agencies; RPC secretariats monitor non-compliance and report unresolved cases to the Commission (p6–10). Users and requesters must supply compatible equipment, integrate with CTU/STU systems and maintain and upgrade their own terminal equipment (p10).
The operating clauses define the boundary of the ISTS communication system by node category, including 132/110 kV substations and lines, ISGS, solar and wind generation connected to ISTS, and HVDC stations, with prospective wideband planning for expected nodes (p10–11); provide for access to the communication system; require periodic testing, including security testing of third-party systems; prescribe fault reporting with route diversion or channel reallocation at no separate charge; set a channel-availability obligation on communication system owners; and require cyber-security design to CEA standards with NLDC monitoring reported at RPC level (p11–12).
The closing clauses require NLDC to submit interfacing and availability-calculation guidelines for Commission approval within a fixed period after gazette notification, after a public comment round and with a statement on comments not accepted; route disputes to the Commission under the Conduct of Business Regulations; and preserve the Commission's powers to relax provisions and remove difficulties by order (p12–13).
Read with this
The regulation
Commencement notices and reasons
Procedures and orders made under it
- Dated 19 Jan 2024Procedure on Maintenance and Testing of Communication System under the Communication System for inter-State transmission of electricity Regulations, 2017 — Approval Order, 2024
- Dated 19 Jan 2024Centralized Supervision for Quick Fault Detection and Restoration Procedure, 2024 — Approval Order under Communication System Regulations, 2017
- Dated 19 Jan 2024Guidelines on Availability of Communication System, 2024
- Dated 19 Jan 2024Guidelines on Interfacing Requirements under the Communication System for inter-State Transmission of Electricity Regulations, 2017
Earlier drafts
- Dated 7 Sep 2016Public notice: Communication System for inter-State Transmission of Electricity Regulations, 2016 — Public Notice — Draft
- Released with the notice dated 7 Sep 2016Explanatory memorandum: Draft Communication System for inter-State Transmission of Electricity Regulations, 2016 — Explanatory Memorandum
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.