CERC · Central Electricity Regulatory Commission
Communication System for inter-State Transmission of Electricity Regulations, 2017
Central Electricity Regulatory Commission (Communication System for inter-State transmission of electricity) Regulations, 2017
RegulationDated 15 May 2017In force from 1 Jul 2017File No. L-1/210/2016/CERC dated 15th May 2017
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's principal regulation for the communication system that underpins inter-State transmission and National Grid operation, issued 15 May 2017 and brought into force from 1 July 2017 (p1). The preamble sets out the rationale — communication is the backbone of inter-State transmission, and the regulation is to provide rules, guidelines and standards for continuous data availability for system and market operation (p1).
The operative text runs from Regulation 1 to 17 (pp1–11). Regulation 1 gives the title and commencement; Regulation 2 defines the technical and institutional vocabulary (communication system, communication channel, control centre, RTU, PMU, wideband node, User, REMC, forecasting service provider, etc.) (p1–4). Regulations 4 and 5 state the objective and the scope: the regulation binds Users, SLDCs, RLDCs, NLDC, CEA, CTU, STUs, RPCs, REMCs, FSPs and Power Exchanges, and extends to the State-level power system until SERCs make their own communication regulations (p4).
Regulation 6 names nodal agencies — CTU for inter-State, STU for intra-State, RLDC/SLDC for integration with SCADA, WAMS, video conferencing, AMR, EPABX and tele-protection (p4–5). Regulation 7 is the longest part: it assigns planning, coordination, integration, supervision and reporting duties to CEA, CTU, NPC/RPC, NLDC, RLDCs, SLDCs, STUs and Users, with some duties tied to timelines keyed to notification or to CEA's technical standards (p5–8). Regulation 8 draws the boundary of the inter-State and intra-State communication systems by listing the entities and assets inside each (p8–9).
The remainder is compliance machinery: periodic testing (Reg 9) and annual performance audit by RPC secretariats (Reg 10) (p9); fault reporting and route diversion (Reg 11); an annual communication channel availability standard, higher where backup exists (Reg 12) (p9–10); cyber security planning, monitoring and third-party audits by CERT-In certified auditors (Reg 13) (p10); the list of guidelines/procedures to be prepared by NLDC, CTU and NPC with public consultation and Commission approval (Reg 14) (p10); dispute resolution through the Conduct of Business Regulations (Reg 15); and the Commission's powers to relax provisions and remove difficulties (Regs 16–17) (p10–11). There are no schedules or annexures; the document is text only and ends with the Secretary's signature (p11).
Read with this
Commencement notices and reasons
Procedures and orders made under it
- Dated 19 Jan 2024Procedure on Maintenance and Testing of Communication System under the Communication System for inter-State transmission of electricity Regulations, 2017 — Approval Order, 2024
- Dated 19 Jan 2024Centralized Supervision for Quick Fault Detection and Restoration Procedure, 2024 — Approval Order under Communication System Regulations, 2017
- Dated 19 Jan 2024Guidelines on Availability of Communication System, 2024
- Dated 19 Jan 2024Guidelines on Interfacing Requirements under the Communication System for inter-State Transmission of Electricity Regulations, 2017
Earlier drafts
- Released with the notice dated 7 Sep 2016Communication System for inter-State Transmission of Electricity Regulations, 2016 — Draft
- Dated 7 Sep 2016Public notice: Communication System for inter-State Transmission of Electricity Regulations, 2016 — Public Notice — Draft
- Released with the notice dated 7 Sep 2016Explanatory memorandum: Draft Communication System for inter-State Transmission of Electricity Regulations, 2016 — Explanatory Memorandum
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.