Draft Communication System for inter-State Transmission of Electricity Regulations, 2016 — Explanatory Memorandum

"Draft Central Electricity Regulatory Commission (Communication system for inter-State transmission of electricity) Regulations, 2016" Explanatory Memorandum

Explanatory memorandum to a draftReleased with the notice dated 7 Sep 2016

Explanatory memorandum to the Communication System for inter-State Transmission of Electricity Regulations, 2016 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Explanatory Memorandum accompanying the Commission's draft CERC (Communication system for inter-State transmission of electricity) Regulations, 2016 — a proposed new regulation to bring planning, technical standards, roles and availability norms for power-sector communication into one instrument, replacing the fragmentary treatment in the IEGC 2010 and the CEA connectivity standards (p1, p3).

The background (pp1–3) reproduces IEGC Regulation 4.6.2 and CEA Technical Standards Regulation 6(3), which require users, STUs and CTU to provide speech and data communication and telemetering up to CTU's Data Collection Point; it records that many entities have not complied and that data adequacy and reliability are unsatisfactory, and cites the Commission's order of 26.9.2012 in Petition No. 168/MP/2011. It then records the Task Force constituted on 22.04.2015 under Neerja Mathur, which reported on 12.02.2016 (p3).

Planning (pp3–4) proposes that CEA be entrusted with planning criteria, technical standards, protocols and a continuously updated perspective communication plan, that communication be planned alongside transmission lines using OPGW or separately strung fibre on towers, and that a Standing Committee on Communication Systems be set up to decide the mode of communication node to node. Cost sharing and availability (pp4–5) note that cost-sharing principles sit in the Tariff Regulations while no availability norm for communication exists. Roles and responsibilities (pp5–6) make CTU the nodal agency for ISTS communication and STUs for intra-State, give RLDCs/SLDCs the integration role for SCADA, WAMS, tele-protection and AMI, and give NLDC the interfacing-guideline function with a deadline of 60 days from notification. Broad features (p7) list the nodes to be covered. Route diversion (pp7–8) sets the fault-reporting and restoration chain. Testing (p8) requires users to facilitate periodic testing, including network-security testing of third-party systems. The memo closes by stating the draft regulations have been framed on this basis (p8).

Primary topics
Communication and SCADA, Network planning and investment, Technical standards

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.