CERC · Central Electricity Regulatory Commission
Guidelines on Interfacing Requirements under the Communication System for inter-State Transmission of Electricity Regulations, 2017
Approval of Guidelines on "Interface Requirements" under the Central Electricity Regulatory Commission (Communication System for inter-State transmission of electricity) Regulations, 2017.
GuidelinesDated 19 Jan 2024No.- L-1/210/2016/CERC dated 19 th January, 2024
Made under the Communication System for inter-State Transmission of Electricity Regulations, 2017.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a CERC order, No. L-1/210/2016/CERC dated 19 January 2024, approving the Guidelines on "Interfacing Requirements" for communication systems used in inter-State transmission (p1). The order records that Regulation 7.4 read with Regulation 14.2 of the CERC (Communication System for inter-State transmission of electricity) Regulations, 2017 requires NLDC to prepare such guidelines in consultation with stakeholders and submit them for the Commission's approval; NLDC did so and the Commission approved them after making suitable changes, enclosing them as an Annexure (p1–2). No commencement or Gazette publication date for this order is printed.
The Guidelines themselves (p3–11) are built on the CEA (Technical Standards for Communication System in Power System Operations) Regulations, 2020, issued 27 February 2020 (p3). Section 1 binds Users, SLDCs, RLDCs, NLDC, CTU, STUs, NHPTL, REMC, Forecasting Service Providers, Power Exchanges and ISTS licensees, and applies to main and backup control centres alike (p3). Section 2 adopts definitions from the Electricity Act and other instruments and defines "Remote Station" (p4). Section 3 requires telemetering of power system parameters — flows, voltages, switch/tap status and sequence of events — with Annexure I listing the minimum parameters, analog sign conventions per IEEE and digital status per IEC, and Annexure II showing the point of interface (p4–5).
Section 4 specifies the communication interfaces users must support — real-time data and AGC signals, phasor data, meter data, protection signals, voice and video — for remote stations, control centres and communication equipment, including protocol choices, redundancy, route diversity and single-contingency design (p5–10). Section 5 covers cross-border interconnections under the CERC Cross Border Trade of Electricity Regulations 2019, requiring network isolation at landing points on the Indian side (p10). Section 6 imposes CERT-In and NCIIPC-aligned cyber security requirements, firewalls and VLAN separation (p10–11). Section 7 leaves maintenance, validation and testing procedures to CTU (p11), and Section 8 provides for revision as technology changes or deficiencies arise, with CERC approval (p11). Four annexures follow: parameter lists for SCADA and PMU signals (p12–19), typical bay/layout diagrams (p20–23), a typical remote station general arrangement for IEC-101/104 RTUs (p24–25), and a cyber security data-transfer diagram (p26).
Read with this
The regulation
Commencement notices and reasons
Procedures and orders made under it
- Dated 19 Jan 2024Procedure on Maintenance and Testing of Communication System under the Communication System for inter-State transmission of electricity Regulations, 2017 — Approval Order, 2024
- Dated 19 Jan 2024Centralized Supervision for Quick Fault Detection and Restoration Procedure, 2024 — Approval Order under Communication System Regulations, 2017
- Dated 19 Jan 2024Guidelines on Availability of Communication System, 2024
Earlier drafts
- Released with the notice dated 7 Sep 2016Communication System for inter-State Transmission of Electricity Regulations, 2016 — Draft
- Dated 7 Sep 2016Public notice: Communication System for inter-State Transmission of Electricity Regulations, 2016 — Public Notice — Draft
- Released with the notice dated 7 Sep 2016Explanatory memorandum: Draft Communication System for inter-State Transmission of Electricity Regulations, 2016 — Explanatory Memorandum
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.