Guidelines on Interfacing Requirements under the Communication System for inter-State Transmission of Electricity Regulations, 2017

Approval of Guidelines on "Interface Requirements" under the Central Electricity Regulatory Commission (Communication System for inter-State transmission of electricity) Regulations, 2017.

GuidelinesDated 19 Jan 2024No.- L-1/210/2016/CERC dated 19 th January, 2024

Made under the Communication System for inter-State Transmission of Electricity Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a CERC order, No. L-1/210/2016/CERC dated 19 January 2024, approving the Guidelines on "Interfacing Requirements" for communication systems used in inter-State transmission (p1). The order records that Regulation 7.4 read with Regulation 14.2 of the CERC (Communication System for inter-State transmission of electricity) Regulations, 2017 requires NLDC to prepare such guidelines in consultation with stakeholders and submit them for the Commission's approval; NLDC did so and the Commission approved them after making suitable changes, enclosing them as an Annexure (p1–2). No commencement or Gazette publication date for this order is printed.

The Guidelines themselves (p3–11) are built on the CEA (Technical Standards for Communication System in Power System Operations) Regulations, 2020, issued 27 February 2020 (p3). Section 1 binds Users, SLDCs, RLDCs, NLDC, CTU, STUs, NHPTL, REMC, Forecasting Service Providers, Power Exchanges and ISTS licensees, and applies to main and backup control centres alike (p3). Section 2 adopts definitions from the Electricity Act and other instruments and defines "Remote Station" (p4). Section 3 requires telemetering of power system parameters — flows, voltages, switch/tap status and sequence of events — with Annexure I listing the minimum parameters, analog sign conventions per IEEE and digital status per IEC, and Annexure II showing the point of interface (p4–5).

Section 4 specifies the communication interfaces users must support — real-time data and AGC signals, phasor data, meter data, protection signals, voice and video — for remote stations, control centres and communication equipment, including protocol choices, redundancy, route diversity and single-contingency design (p5–10). Section 5 covers cross-border interconnections under the CERC Cross Border Trade of Electricity Regulations 2019, requiring network isolation at landing points on the Indian side (p10). Section 6 imposes CERT-In and NCIIPC-aligned cyber security requirements, firewalls and VLAN separation (p10–11). Section 7 leaves maintenance, validation and testing procedures to CTU (p11), and Section 8 provides for revision as technology changes or deficiencies arise, with CERC approval (p11). Four annexures follow: parameter lists for SCADA and PMU signals (p12–19), typical bay/layout diagrams (p20–23), a typical remote station general arrangement for IEC-101/104 RTUs (p24–25), and a cyber security data-transfer diagram (p26).

Primary topics
Communication and SCADA, Technical standards, Cyber security

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document