Skip to content

CERC · Central Electricity Regulatory Commission

Centralized Supervision for Quick Fault Detection and Restoration Procedure, 2024 — Approval Order under Communication System Regulations, 2017

Approval of Procedure on "Centralized supervision for quick fault detection and restoration" under the Central Electricity Regulatory Commission (Communication System for inter-State transmission of electricity) Regulations, 2017

ProcedureDated 19 Jan 2024No.- L-1/210/2016/CERC dated 19th January, 2024

Made under the Communication System for inter-State Transmission of Electricity Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Commission approves a CTU-prepared Procedure for centralised supervision, quick fault detection and restoration of power-system communication networks. The order (p1–2) records that Regulation 7.2 of the Communication Regulations, 2017 required CTU to prepare the Procedure after stakeholder consultation and submit it for approval; CTU made submissions in 2017, 2021 and 2023, and the Commission approves the Procedure with suitable changes, annexed to the order.

The annexed Procedure (p3–15) sets background, objective and applicability (p5): it covers ISTS communication infrastructure and intra-State transmission communication infrastructure until the relevant SERC frames its own communication regulation, and binds Users as defined in the Communication Regulations, including generators/CGPs, RE generators, transmission licensees, distribution licensees, bulk consumers connected to ISTS/intra-State transmission, SLDCs, RLDCs, NLDC, CTU, STUs, RPCs, REMCs, FSPs and power exchanges. It categorises communication systems into ISTS, intra-State and cross-border (p6). Section 5 (p6–8) specifies the Centralized Network Management System (CNMS)/Centralized Supervision and Monitoring System (CSMS) to be implemented by CTU at national/regional level, its broad features, integration with users’ NMS and standalone elements, and cyber-security obligations including RPC-level third-party audits through CERT-In certified auditors. Section 6 (p8–9) sets the implementation process, with CTU and STU as nodal agencies for ISTS and intra-State systems. Section 7 (p9) covers O&M staffing and training. Sections 8–10 (p10–15) lay down fault reporting, trouble-ticket and alarm procedures, escalation, fault restoration, route diversion without separate charges, nodal-officer coordination, roles of owners/users and CTU’s Network Monitoring Team, and periodic reports CTU must publish. Section 11 (p15) provides for CTU review/revision with Commission approval. Annexure-I (p16) gives a typical escalation matrix; Annexure-II (p17–20) prescribes data/reports and formats from owners/users and control centres. Appendix-I (p21–23) describes the existing manual NMS/log-book procedure that will apply until CSMS is in place.

Primary topics
Communication and SCADA, Cyber security

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document