Guidelines on Availability of Communication System, 2024

Approval of "Guidelines on Availability of Communication System" under the Central Electricity Regulatory Commission (Communication System for inter-State transmission of electricity) Regulations, 2017.

GuidelinesDated 19 Jan 2024No.- L-1/210/2016/CERC dated 19 th January, 2024

Made under the Communication System for inter-State Transmission of Electricity Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Commission's order of 19 January 2024 approves the "Guidelines on Availability of Communication System" prepared by the National Power Committee (NPC) and encloses them as an Annexure (p1-2, p3). Regulation 7.3 of the CERC (Communication System for inter-State transmission of electricity) Regulations, 2017 required NPC to prepare such guidelines in consultation with stakeholders - RPCs, RLDCs, CTU and others - and submit them for the Commission's approval; the Commission examined them and, after incorporating suitable changes, approved them (p1, p4).

The Annexure (p4-8) is the operative text. Section 1 states the purpose of the guidelines and reproduces the relevant communication-system provisions from the CEA Technical Standards for Connectivity to the Grid Regulations 2007 (Reg 6(3)), the CEA Technical Standards for Communication System in Power System Operations Regulations 2020 (Reg 5(1)) and Regulation 11 of the IEGC 2023 (p4-5). Section 2 adopts the meanings given in those instruments. Section 3 sets scope and applicability: the guidelines bind CTU for the inter-State transmission communication infrastructure and STU for intra-State infrastructure until the respective SERC frames its own communication regulation; CTU/STU must have back-to-back coordination or agreements with transmission licensees, generators, dedicated transmission line owners and bulk consumers (p5).

Section 3.4 allocates reporting duties - CTU/STU submit details of configured channels, including redundant channels, monthly to RLDC/SLDC, submit the previous month's availability to RLDC for verification and onward transmission to the RPC, and submit availability reports generated from a centralized NMS (p6). Section 4 governs treatment of outages: outages due to acts of God and force majeure are deemed available, subject to the provider satisfying the Member Secretary, RPC; outages longer than one minute in a time-block make the whole block not available, while outages of up to one minute are deemed available only if not more than ten times a day (p6-7).

Section 5 gives the computation methodology: Availability of Communication System (ACS) is the average over N channels of each channel's availability, derived from the total time-blocks in a month less time-blocks not available, after the deemed-availability deductions, with two worked illustrations (p7-8). Section 6 provides for review and revision of the guidelines by NPC with the Commission's approval (p8).

Primary topics
Communication and SCADA

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document