CERC · Central Electricity Regulatory Commission
Communication System for inter-State Transmission Regulations, 2017 — Statement of Reasons
Statement of Reasons
Statement of reasonsDated 31 May 2017
The commission's reasons for the Communication System for inter-State Transmission of Electricity Regulations, 2017.
Summary
Summary written by software, from pages 1 to 29 of 34. Check the regulator's original before you rely on it.
CERC's Statement of Reasons, dated 31 May 2017, explains the Commission's decisions on the draft CERC (Communication System for inter-State transmission of Electricity) Regulations, 2017 (p1). It is the reasoning record, not the notified regulations: it summarises stakeholder comments and quotes the finalised clauses that the Commission agreed to (p1–3).
The background section says communication systems are essential for secure grid operation, but existing IEGC 2010 and CEA connectivity provisions do not cover planning, roles, standards or availability norms (p1–2). The draft 2016 regulations were published on 7 September and 28 October 2016; comments came from POSOCO, PGCIL, NTPC and MPPTCL, with a public hearing on 17 November 2016 (p3). The regulations are to be effective from 1 July 2017 because procedures and guidelines get time for notification (p3).
The bulk of the document is section-by-section. Definitions (Regulation 2) are revised to add Communication Channel, Communication network, Communication system, Control Centre, Data and Wideband Node; Requester and O&M expenses are deleted, and User is widened to cover intra-State connections (p3–7). The objective (Regulation 4) becomes planning, implementation, O&M and upgrading of reliable communication for integrated national grid operation (p7–8). Scope (Regulation 5) is pan-India and covers intra-State entities until SERCs frame their own regulations (p8). Nodal agencies (Regulation 6) are CTU for inter-State users, STU for intra-State users, and RLDC/SLDC for integration at load despatch centres (p8–9).
Roles take up most of the remaining pages. CEA is to issue planning criteria, technical standards and cyber-security requirements (p9–11); CTU is to plan the national backbone, cross-border links, wideband access, NMS and procedures (p11–15); NPC/RPC are to handle availability guidelines, certification, outage planning, non-compliance and audit (p15–16, p25–26). NLDC, RLDC, SLDC, STU and Users are each assigned integration, data, O&M and feedback duties (p16–21). Boundaries for ISTS and intra-State communication systems are set (p21–24). Access provisions are deleted from a standalone regulation and moved into CTU/STU roles (p24–25). Testing, audit, fault reporting and route diversion are specified (p25–27). Availability obligations are set, with detailed norms left to NPC guidelines and no incentive/disincentive now (p27–29). Cyber security (Regulation 13) begins at p29.
Read with this
The regulation
Procedures and orders made under it
- Dated 19 Jan 2024Procedure on Maintenance and Testing of Communication System under the Communication System for inter-State transmission of electricity Regulations, 2017 — Approval Order, 2024
- Dated 19 Jan 2024Centralized Supervision for Quick Fault Detection and Restoration Procedure, 2024 — Approval Order under Communication System Regulations, 2017
- Dated 19 Jan 2024Guidelines on Availability of Communication System, 2024
- Dated 19 Jan 2024Guidelines on Interfacing Requirements under the Communication System for inter-State Transmission of Electricity Regulations, 2017
Earlier drafts
- Released with the notice dated 7 Sep 2016Communication System for inter-State Transmission of Electricity Regulations, 2016 — Draft
- Dated 7 Sep 2016Public notice: Communication System for inter-State Transmission of Electricity Regulations, 2016 — Public Notice — Draft
- Released with the notice dated 7 Sep 2016Explanatory memorandum: Draft Communication System for inter-State Transmission of Electricity Regulations, 2016 — Explanatory Memorandum
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.