Skip to content

UERC · Uttarakhand Electricity Regulatory Commission

Multi Year Tariff Regulations, 2018 — Statement of Reasons

Statement of Reasons, Multi Year Tariff Regulations, 2018

Statement of reasonsDated 14 Sep 2018

Replaced by a later regulation Voltaic does not hold

Voltaic does not show the regulation that replaces it, so check the regulator's website for it.

The commission's reasons for the Multi Year Tariff Regulations, 2018 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Statement of Objects and Reasons issued by the Uttarakhand Electricity Regulatory Commission on 14 September 2018 as the companion document to the UERC (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2018 (p1). It is the Commission's own account of the consultation behind the 2018 MYT Regulations and of how it dealt with each objection raised.

Page 1 sets the background: the previous UERC Tariff Regulations, 2015 governed tariff filing and determination over a control period of three financial years, 1 April 2016 to 31 March 2019; a draft for the ensuing control period was circulated for comments, which closed on 30 May 2018, and a public hearing was held on 29 June 2018. The SoR states plainly that where it and the 2018 Regulations differ, the Regulations prevail (p1).

Pages 2–27 are the substance. Para 4 takes each draft provision in turn — quoting it, summarising the stakeholder's suggestion and recording the Commission's view. The provisions covered run across definitions (Design Energy, Force Majeure, Maximum Continuous Rating, Transmission Loss), uncontrollable and controllable factors in annual performance review, capital cost and capital structure, additional capitalisation, interest and finance charges, working capital, O&M expense norms and their escalation formula, NAPAF, gross station heat rate, auxiliary energy consumption, capacity and energy charges for hydro stations, start-up power, transmission target availability and non-tariff income (p2–27). Almost every suggestion is rejected; two are accepted, both on hydro O&M (p18, p20–21).

Pages 28–29 are the annexures listing the stakeholders who commented on the draft and the participants who attended the hearing (p1, p28–29).

The SoR is not itself operative — it is the reasoning record of the 2018 Regulations, and it repeatedly directs parties to raise case-specific claims at tariff filing or truing up rather than through the Regulations.

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, ARR and true-up

Read with this

The regulation

Procedures and orders made under it

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document