UERC · Uttarakhand Electricity Regulatory Commission
Thermal/Gas Formats
Formats for Thermal/Gas
OrderDate not stated
Replaced by a later regulation Voltaic does not hold
Voltaic does not show the regulation that replaces it, so check the regulator's website for it.
Made under the Multi Year Tariff Regulations, 2018.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a compendium of prescribed pro-formas — 40 numbered formats labelled F-1.1 through F-13 — that a thermal or gas-based generating company fills in when filing a tariff petition, truing-up or annual performance review with the Commission. It is a forms annexure rather than a regulation: there is an index of formats on p1 and a 'Petitioner' footer on nearly every page, but no enacting clause.
The revenue block (pp2–9) covers the per-unit rate computation and revenue/revenue-requirement summary (F-1.1, F-1.2), saleable energy, plant availability factor, monthly generation and the salient technical features of the station (F-2.1 to F-2.3), net annual fixed charges (F-3) and energy charges, fuel stocks and gas fuel data (F-4.1, F-4.2A).
The capital-cost block (pp10–35) runs from the gross fixed asset base, financing plan and capital cost estimates for new projects (F-5.1, F-5.1A) and depreciation statements (F-5.2, F-5.3), through capital expenditure, CWIP, COD schedules and head-wise cost break-up including a dedicated gas-project break-up (F-6.1 to F-6.6), the drawdown schedule for IDC and financing charges (F-6.7), cost over-run and time over-run statements (F-6.8, F-6.10), actual cash expenditure (F-6.9), year-wise additional capitalisation after COD and at the fag end of useful life (F-6.11, F-6.12), reconciliation with books, de-capitalisation, exclusions (F-6.13, F-6.14, F-6.14A) and return on equity including additional RoE claims (F-6.15, F-6.15A).
The financing and expense block (pp36–49) covers capital cost and financing structure (F-7), financial packages (F-8), outstanding loans and interest computations — actual, weighted-average and normative (F-9.1 to F-9.3), working capital interest for gas stations (F-10A), O&M, R&M, employee and A&G expenses (F-11 to F-11.3), non-tariff income (F-12) and the truing-up / annual performance review summary (F-13).
Every format is laid out on the same time axis — previous year actuals, current year split into April–September actual and October–March estimates, and three projected ensuing years — so the same set of forms serves truing-up, mid-year review and multi-year projection. A note on p3 fixes n as FY 2012-13 and a note on p29 refers to the tariff period 2014-19.
Read with this
The regulation
- Dated 14 Sep 2018Multi Year Tariff Regulations, 2018
Amendments and corrections
Commencement notices and reasons
- Dated 14 Sep 2018Multi Year Tariff Regulations, 2018 — Statement of Reasons
Procedures and orders made under it
- Date not statedFormats for Distribution
- Date not statedFormats for Transmission
- Date not statedSLDC Formats
- Date not statedHydro Generation Formats
Earlier drafts
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.