UERC · Uttarakhand Electricity Regulatory Commission

Thermal/Gas Formats

Formats for Thermal/Gas

OrderDate not stated

Replaced by a later regulation Voltaic does not hold

Voltaic does not show the regulation that replaces it, so check the regulator's website for it.

Made under the Multi Year Tariff Regulations, 2018.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a compendium of prescribed pro-formas — 40 numbered formats labelled F-1.1 through F-13 — that a thermal or gas-based generating company fills in when filing a tariff petition, truing-up or annual performance review with the Commission. It is a forms annexure rather than a regulation: there is an index of formats on p1 and a 'Petitioner' footer on nearly every page, but no enacting clause.

The revenue block (pp2–9) covers the per-unit rate computation and revenue/revenue-requirement summary (F-1.1, F-1.2), saleable energy, plant availability factor, monthly generation and the salient technical features of the station (F-2.1 to F-2.3), net annual fixed charges (F-3) and energy charges, fuel stocks and gas fuel data (F-4.1, F-4.2A).

The capital-cost block (pp10–35) runs from the gross fixed asset base, financing plan and capital cost estimates for new projects (F-5.1, F-5.1A) and depreciation statements (F-5.2, F-5.3), through capital expenditure, CWIP, COD schedules and head-wise cost break-up including a dedicated gas-project break-up (F-6.1 to F-6.6), the drawdown schedule for IDC and financing charges (F-6.7), cost over-run and time over-run statements (F-6.8, F-6.10), actual cash expenditure (F-6.9), year-wise additional capitalisation after COD and at the fag end of useful life (F-6.11, F-6.12), reconciliation with books, de-capitalisation, exclusions (F-6.13, F-6.14, F-6.14A) and return on equity including additional RoE claims (F-6.15, F-6.15A).

The financing and expense block (pp36–49) covers capital cost and financing structure (F-7), financial packages (F-8), outstanding loans and interest computations — actual, weighted-average and normative (F-9.1 to F-9.3), working capital interest for gas stations (F-10A), O&M, R&M, employee and A&G expenses (F-11 to F-11.3), non-tariff income (F-12) and the truing-up / annual performance review summary (F-13).

Every format is laid out on the same time axis — previous year actuals, current year split into April–September actual and October–March estimates, and three projected ensuing years — so the same set of forms serves truing-up, mid-year review and multi-year projection. A note on p3 fixes n as FY 2012-13 and a note on p29 refers to the tariff period 2014-19.

Primary topics
Generation tariff, ARR and true-up, Capital cost and investment

Read with this

The regulation

Commencement notices and reasons

Procedures and orders made under it

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document