Multi Year Tariff Regulations, 2018

Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2018

RegulationDated 14 Sep 2018No. F-9(29)/RG/UERC/2018/852 dated September 14, 2018

Replaced by a later regulation Voltaic does not hold

Voltaic does not show the regulation that replaces it, so check the regulator's website for it.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software, from pages 1 to 23 of 74. Check the regulator's original before you rely on it.

The UERC Tariff Regulations, 2018 are the Uttarakhand Electricity Regulatory Commission's multi-year tariff (MYT) framework. Notified on 14 September 2018 under section 61 read with section 181 of the Electricity Act 2003, they govern tariff determination for FY 2019-20 to FY 2021-22 — 1 April 2019 to 31 March 2022 — throughout Uttarakhand (p1).

Part I (pp1–11) — Preliminary. Sets the title, extent and the three-year applicability window, then the scope: supply by a generating company to a distribution licensee, intra-state transmission, SLDC charges and retail supply, with provisos for ceiling tariffs during shortage and for open-access charges (wheeling, cross-subsidy surcharge, additional surcharge) read with the Intra-State Open Access Regulations (p1–2). Competitively bid stations under section 63 and renewable generators (governed by the UERC RE Regulations) are carved out, and matters up to 31 March 2019 stay under the earlier regulations (p2). Regulation 3 then defines the working vocabulary of the whole framework, from accounting statements and capital cost to availability, useful life and zero date (p2–11).

Part II (pp12–21) — MYT framework. Lays out the multi-year machinery: business plans by each utility class, nomination of a control period, norms of operation as ceiling norms, determination of base-year baselines, the MYT petition and its formats, annual accounts, the Annual Performance Review with truing up and categorisation of variations into controllable and uncontrollable factors, the sharing of gains and losses, yearly tariff determination, contents of a tariff petition, orders within 120 days, publication and communication of tariff orders (p12–21).

Part III (pp21–23+) — Financial principles. Begins the cost and return rules: capital cost of existing and new projects, exclusions and de-capitalisation, in-principle approval of capital cost and financing plan, prudence check against benchmark norms and the treatment of cost overruns, then Interest During Construction.

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, ARR and true-up

Read with this

Commencement notices and reasons

Procedures and orders made under it

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document