UERC · Uttarakhand Electricity Regulatory Commission
Terms and Conditions for Determination of Multi Year Tariff (First Amendment) Regulations, 2020
UERC (Terms and Conditions for Determination of Multi Year Tariff) (First Amendment) Regulations, 2020
AmendmentDated 26 Nov 2020No. F-9(29)(I)/RG/UERC/2020/923 dated November 26, 2020
Replaced by a later regulation Voltaic does not hold
Voltaic does not show the regulation that replaces it, so check the regulator's website for it.
Amends the Multi Year Tariff Regulations, 2018.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a four-clause amendment by the Uttarakhand Electricity Regulatory Commission to its 2018 Multi Year Tariff (MYT) Regulations, notified on 26 November 2020 and expressed to come into force from the date of that notification (p1). It is made under Section 61 read with Section 181 of the Electricity Act, 2003, after previous publication.
Regulation 2 substitutes clause 2(a)(v) of Regulation 33, rewriting how interest on the distribution licensee's estimated working capital is to be computed: the amendment sets out the components that build the working-capital estimate — operation and maintenance expenses, maintenance spares, a share of expected revenue from electricity sales, capital for collection shortfalls, and a deduction for power purchase cost — without changing the surrounding framework (p2).
Regulation 3 adds two items to the illustrative list, in Regulation 12(6), of performance variations the Commission may attribute to controllable factors: rebate earned on discharge of power purchase liability, and late payment surcharge for delayed discharge of that liability (p2–3).
Regulation 4 appends a second proviso to Regulation 84(3), providing that repair and maintenance expenses for IT-related and non-IT-related assets be computed separately where the distribution utility maintains asset-wise records of such expenses (p3–4). It sits alongside the existing formula-based computation of employee, R&M and A&G costs.
Read with this
The regulation
- Dated 14 Sep 2018Multi Year Tariff Regulations, 2018
Commencement notices and reasons
- Dated 14 Sep 2018Multi Year Tariff Regulations, 2018 — Statement of Reasons
Procedures and orders made under it
- Date not statedFormats for Distribution
- Date not statedFormats for Transmission
- Date not statedSLDC Formats
- Date not statedHydro Generation Formats
- Date not statedThermal/Gas Formats
Earlier drafts
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.