UERC · Uttarakhand Electricity Regulatory Commission
Formats for Transmission
OrderDate not stated
Replaced by a later regulation Voltaic does not hold
Voltaic does not show the regulation that replaces it, so check the regulator's website for it.
Made under the Multi Year Tariff Regulations, 2018.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is not a regulation with operative tariff principles; it is a compendium of blank formats for a transmission licensee to file its ARR, transmission tariff, capital-cost and truing-up petition before the Commission. Page 1 is an index of 45 formats; the rest of the document sets out the form templates and their notes.
The core financial forms start with Form 1, an Aggregate Revenue Requirement table that brings together energy available, energy transmitted, transmission loss, revenue, O&M, depreciation, interest, return on equity and surplus/shortfall on a previous-year actual/audited basis, a current-year Apr–Sep actual and Oct–Mar estimated basis, and three projected ensuing years (p2). Form 2 and Form 2.2 capture return on equity and additional RoE (p3–4). Forms 3–7 cover transmission lines and substations (p5), transmission losses (p6), transmission availability factor (p7), income from investments, non-tariff income and other business under s.41 of the Electricity Act 2003 (p8), and open access related charges (p9). Forms 8–8.3 provide O&M expense schedules, employee costs and headcount, R&M and A&G expenses (p10–13).
The largest block, Forms 9.1–9.C, deals with gross fixed assets, deposit works and grants, element-wise project cost, additional capitalisation, scheme-wise capex, incidental expenditure during construction and de-capitalisation (pp14–30). Forms 10.1–10.2 cover asset-wise and aggregate depreciation (pp31–33). Forms 11.1–11.4 deal with capital expenditure, works-in-progress and completion schedules for new schemes (pp34–37). Form 12 gives the draw-down schedule for IDC and financing charges (pp38–39); Form 13 covers capital cost and financing structure (p40); Forms 14–14.1 cover financial packages (pp41–42); Forms 15.1–15.3 cover outstanding loans and interest computations (pp43–46). Form 16 covers interest and finance charges (p47); Form 17 covers working-capital interest (p48).
The closing forms are investment plans (Forms 18 and 19, pp49–50), summary of truing up (Form 20, p51) and performance/asset reporting on shunt capacitors, electrical accidents and transformer failures (Forms 21.1–21.3, pp52–54). Throughout, the forms are templates only: they leave the petitioner to fill in values, attach supporting documents, explain variations, and follow notes on assumptions, foreign-currency items, loan reschedulement and reconciliation with audited accounts.
Read with this
The regulation
- Dated 14 Sep 2018Multi Year Tariff Regulations, 2018
Amendments and corrections
Commencement notices and reasons
- Dated 14 Sep 2018Multi Year Tariff Regulations, 2018 — Statement of Reasons
Procedures and orders made under it
- Date not statedFormats for Distribution
- Date not statedSLDC Formats
- Date not statedHydro Generation Formats
- Date not statedThermal/Gas Formats
Earlier drafts
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.