Skip to content

UERC · Uttarakhand Electricity Regulatory Commission

Formats for Transmission

OrderDate not stated

Replaced by a later regulation Voltaic does not hold

Voltaic does not show the regulation that replaces it, so check the regulator's website for it.

Made under the Multi Year Tariff Regulations, 2018.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is not a regulation with operative tariff principles; it is a compendium of blank formats for a transmission licensee to file its ARR, transmission tariff, capital-cost and truing-up petition before the Commission. Page 1 is an index of 45 formats; the rest of the document sets out the form templates and their notes.

The core financial forms start with Form 1, an Aggregate Revenue Requirement table that brings together energy available, energy transmitted, transmission loss, revenue, O&M, depreciation, interest, return on equity and surplus/shortfall on a previous-year actual/audited basis, a current-year Apr–Sep actual and Oct–Mar estimated basis, and three projected ensuing years (p2). Form 2 and Form 2.2 capture return on equity and additional RoE (p3–4). Forms 3–7 cover transmission lines and substations (p5), transmission losses (p6), transmission availability factor (p7), income from investments, non-tariff income and other business under s.41 of the Electricity Act 2003 (p8), and open access related charges (p9). Forms 8–8.3 provide O&M expense schedules, employee costs and headcount, R&M and A&G expenses (p10–13).

The largest block, Forms 9.1–9.C, deals with gross fixed assets, deposit works and grants, element-wise project cost, additional capitalisation, scheme-wise capex, incidental expenditure during construction and de-capitalisation (pp14–30). Forms 10.1–10.2 cover asset-wise and aggregate depreciation (pp31–33). Forms 11.1–11.4 deal with capital expenditure, works-in-progress and completion schedules for new schemes (pp34–37). Form 12 gives the draw-down schedule for IDC and financing charges (pp38–39); Form 13 covers capital cost and financing structure (p40); Forms 14–14.1 cover financial packages (pp41–42); Forms 15.1–15.3 cover outstanding loans and interest computations (pp43–46). Form 16 covers interest and finance charges (p47); Form 17 covers working-capital interest (p48).

The closing forms are investment plans (Forms 18 and 19, pp49–50), summary of truing up (Form 20, p51) and performance/asset reporting on shunt capacitors, electrical accidents and transformer failures (Forms 21.1–21.3, pp52–54). Throughout, the forms are templates only: they leave the petitioner to fill in values, attach supporting documents, explain variations, and follow notes on assumptions, foreign-currency items, loan reschedulement and reconciliation with audited accounts.

Primary topics
Transmission tariff, ARR and true-up, Capital cost and investment

Read with this

The regulation

Commencement notices and reasons

Procedures and orders made under it

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document