Skip to content

UERC · Uttarakhand Electricity Regulatory Commission

Formats for Distribution

OrderDate not stated

Replaced by a later regulation Voltaic does not hold

Voltaic does not show the regulation that replaces it, so check the regulator's website for it.

Made under the Multi Year Tariff Regulations, 2018.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software, from pages 1 to 76 of 79. Check the regulator's original before you rely on it.

Supplied pages 1–76 are a set of reporting formats for a distribution licensee, not a regulation with operative clauses. Page 1 is an index of 59 forms, F-1 through F-18.11. Form F-1 (p2) is the summary annual revenue requirement, with columns for previous, current and ensuing years and lines for power purchase, transmission/NLDC/RLDC/SLDC charges, O&M, interest, depreciation, working capital, bad debts, return on equity and deductions for non-tariff income, wheeling income, Section 51 income and cross-subsidy/additional surcharge receipts. Forms F-2.1–F-2.9 (pp3–20) set out demand and energy forecasts: sales, consumer numbers, load, distribution losses, energy distribution, availability of power, UI over/under-drawal, energy balance and power purchase expenses. F-3 (p21) covers transmission and load dispatch charges. F-4 to F-4.3 (pp22–25) cover O&M, employee cost and staff numbers, R&M and A&G.

The capital and financing block runs from F-5.1 to F-7.5. Forms F-5.1–F-5.4 (pp26–31) set out gross fixed assets, depreciation and grants/subsidies; F-6.1–F-6.10 (pp32–43) cover capital expenditure, capital works-in-progress, capital cost and financing structure, construction/supply/service packages, element-wise project cost, additional capitalisation, incidental expenditure during construction and de-capitalisation. F-7.1–F-7.5 (pp44–50) cover financial packages, draw-down schedules for IDC and financing charges, outstanding loans and interest computations, including normative loans. F-8 and F-9 (pp51–52) cover working capital interest and bad-debt provision. F-9.A (p53) is scheme-wise capital expenditure.

The return and revenue block, F-10 to F-15 (pp54–63), covers return on equity, additional RoE, non-tariff income, wheeling income, revenue from existing and proposed tariffs by category/slab, and collection efficiency. F-16 (pp64–65) is the truing-up summary with approved/actual/deviation and controllable/uncontrollable reasons. F-17.1–F-17.3 (pp66–68) prescribe SAIFI, SAIDI and MAIFI reporting, to be calculated under the UERC (Standards of Performance) Regulations, 2007. F-18.1–F-18.8 (pp69–76) cover shunt capacitors, electrical accidents, feeder-trip outages, load shedding, overloaded feeders, transformer failure, overloaded DTRs and ageing receivables. The forms are organised around previous/current/ensuing years and an MYT Control Period (pp2–63).

Primary topics
Tariff determination, Capital cost and investment, Return, financing and working capital

Read with this

The regulation

Commencement notices and reasons

Procedures and orders made under it

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document