UERC · Uttarakhand Electricity Regulatory Commission
Formats for Distribution
OrderDate not stated
Replaced by a later regulation Voltaic does not hold
Voltaic does not show the regulation that replaces it, so check the regulator's website for it.
Made under the Multi Year Tariff Regulations, 2018.
Summary
Summary written by software, from pages 1 to 76 of 79. Check the regulator's original before you rely on it.
Supplied pages 1–76 are a set of reporting formats for a distribution licensee, not a regulation with operative clauses. Page 1 is an index of 59 forms, F-1 through F-18.11. Form F-1 (p2) is the summary annual revenue requirement, with columns for previous, current and ensuing years and lines for power purchase, transmission/NLDC/RLDC/SLDC charges, O&M, interest, depreciation, working capital, bad debts, return on equity and deductions for non-tariff income, wheeling income, Section 51 income and cross-subsidy/additional surcharge receipts. Forms F-2.1–F-2.9 (pp3–20) set out demand and energy forecasts: sales, consumer numbers, load, distribution losses, energy distribution, availability of power, UI over/under-drawal, energy balance and power purchase expenses. F-3 (p21) covers transmission and load dispatch charges. F-4 to F-4.3 (pp22–25) cover O&M, employee cost and staff numbers, R&M and A&G.
The capital and financing block runs from F-5.1 to F-7.5. Forms F-5.1–F-5.4 (pp26–31) set out gross fixed assets, depreciation and grants/subsidies; F-6.1–F-6.10 (pp32–43) cover capital expenditure, capital works-in-progress, capital cost and financing structure, construction/supply/service packages, element-wise project cost, additional capitalisation, incidental expenditure during construction and de-capitalisation. F-7.1–F-7.5 (pp44–50) cover financial packages, draw-down schedules for IDC and financing charges, outstanding loans and interest computations, including normative loans. F-8 and F-9 (pp51–52) cover working capital interest and bad-debt provision. F-9.A (p53) is scheme-wise capital expenditure.
The return and revenue block, F-10 to F-15 (pp54–63), covers return on equity, additional RoE, non-tariff income, wheeling income, revenue from existing and proposed tariffs by category/slab, and collection efficiency. F-16 (pp64–65) is the truing-up summary with approved/actual/deviation and controllable/uncontrollable reasons. F-17.1–F-17.3 (pp66–68) prescribe SAIFI, SAIDI and MAIFI reporting, to be calculated under the UERC (Standards of Performance) Regulations, 2007. F-18.1–F-18.8 (pp69–76) cover shunt capacitors, electrical accidents, feeder-trip outages, load shedding, overloaded feeders, transformer failure, overloaded DTRs and ageing receivables. The forms are organised around previous/current/ensuing years and an MYT Control Period (pp2–63).
Read with this
The regulation
- Dated 14 Sep 2018Multi Year Tariff Regulations, 2018
Amendments and corrections
Commencement notices and reasons
- Dated 14 Sep 2018Multi Year Tariff Regulations, 2018 — Statement of Reasons
Procedures and orders made under it
- Date not statedFormats for Transmission
- Date not statedSLDC Formats
- Date not statedHydro Generation Formats
- Date not statedThermal/Gas Formats
Earlier drafts
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.