UERC · Uttarakhand Electricity Regulatory Commission
Multi Year Tariff (First Amendment) Regulations, 2020 — Statement of Reasons — Draft
Statement of Reasons for Draft UERC (Terms and Conditions for Determination of Multi Year Tariff) (First Amendment) Regulations, 2020
Statement of reasons for a draftDate not stated
Draft
The draft has since been finalised as the Terms and Conditions for Determination of Multi Year Tariff (First Amendment) Regulations, 2020.
Statement of reasons for a draft that is not on Voltaic.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Commission's Statement of Reasons for a draft First Amendment to the UERC (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2018, the principal regulations notified on 6 October 2018 (p1). It records why the Commission agreed to amend three provisions after the State discom, Uttarakhand Power Corporation Limited, petitioned it; that petition had earlier been rejected by Order dated 03.09.2020 on the ground that regulations can only be amended under section 181 of the Electricity Act, 2003, not by order (p1).
The first change removes sub-clause (a)(v) of Regulation 33(2), which deducted consumer security deposits when computing the discom's normative working capital (p1–2). The Commission accepts that UPCL keeps such deposits in fixed deposits and borrows against them for working capital, so the deduction artificially lowered normative interest on working capital; it reproduces the amended distribution working-capital build-up and clarifies that actual borrowing cost will be reinstated when comparing normative and actual interest, using approved rather than actual collection efficiency (p2–3).
The second change adds sub-clauses (k) and (l) to Regulation 12(6), making rebate earned on timely discharge of power purchase liability and late payment surcharge on delayed discharge both controllable factors, to be shared between discom and consumers under Regulation 14 (p3–4).
The third change amends Regulation 84(3) to allow repair and maintenance expenses on IT and non-IT assets to be computed separately, subject to asset-wise records for the past five years; failing that, R&M is approved on a consolidated basis as before (p4–6). Two UPCL requests are refused: treating consumer DPS as something other than non-tariff income, and adjusting part payments first against DPS (p6).
Read with this
The regulation
- Dated 14 Sep 2018Multi Year Tariff Regulations, 2018
Amendments and corrections
Commencement notices and reasons
- Dated 14 Sep 2018Multi Year Tariff Regulations, 2018 — Statement of Reasons
Procedures and orders made under it
- Date not statedFormats for Distribution
- Date not statedFormats for Transmission
- Date not statedSLDC Formats
- Date not statedHydro Generation Formats
- Date not statedThermal/Gas Formats
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.