UERC · Uttarakhand Electricity Regulatory Commission

Multi Year Tariff (First Amendment) Regulations, 2020 — Statement of Reasons — Draft

Statement of Reasons for Draft UERC (Terms and Conditions for Determination of Multi Year Tariff) (First Amendment) Regulations, 2020

Statement of reasons for a draftDate not stated

Statement of reasons for a draft that is not on Voltaic.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Commission's Statement of Reasons for a draft First Amendment to the UERC (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2018, the principal regulations notified on 6 October 2018 (p1). It records why the Commission agreed to amend three provisions after the State discom, Uttarakhand Power Corporation Limited, petitioned it; that petition had earlier been rejected by Order dated 03.09.2020 on the ground that regulations can only be amended under section 181 of the Electricity Act, 2003, not by order (p1).

The first change removes sub-clause (a)(v) of Regulation 33(2), which deducted consumer security deposits when computing the discom's normative working capital (p1–2). The Commission accepts that UPCL keeps such deposits in fixed deposits and borrows against them for working capital, so the deduction artificially lowered normative interest on working capital; it reproduces the amended distribution working-capital build-up and clarifies that actual borrowing cost will be reinstated when comparing normative and actual interest, using approved rather than actual collection efficiency (p2–3).

The second change adds sub-clauses (k) and (l) to Regulation 12(6), making rebate earned on timely discharge of power purchase liability and late payment surcharge on delayed discharge both controllable factors, to be shared between discom and consumers under Regulation 14 (p3–4).

The third change amends Regulation 84(3) to allow repair and maintenance expenses on IT and non-IT assets to be computed separately, subject to asset-wise records for the past five years; failing that, R&M is approved on a consolidated basis as before (p4–6). Two UPCL requests are refused: treating consumer DPS as something other than non-tariff income, and adjusting part payments first against DPS (p6).

Standard name
Multi Year Tariff Regulations
Primary topics
Return, financing and working capital, Late payment surcharge and rebate, Operating costs and other income

Read with this

The regulation

Commencement notices and reasons

Procedures and orders made under it

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document