Skip to content

UERC · Uttarakhand Electricity Regulatory Commission

Hydro Generation Formats

Formats for Hydro

OrderDate not stated

Replaced by a later regulation Voltaic does not hold

Voltaic does not show the regulation that replaces it, so check the regulator's website for it.

Made under the Multi Year Tariff Regulations, 2018.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a catalogue of blank reporting formats for hydro generating companies, titled 'Formats for Hydro' (p1). It contains no substantive tariff or regulatory clauses: every page is a form or instructing note for data to be filed, and the page 1 index lists 35 forms numbered F-1.1 through F-14A (p1). The instructions use a base year convention, 'n = FY 2012-13', so the previous year is n-1, the current year n, and ensuing years n+1 to n+3 (p2–3).

The first group computes the revenue requirement and per-unit rate: F-1.1/F-1.2 summarise generation, revenue, expenditure, return on equity and surplus/shortfall (p2–3). F-2.1 to F-2.4 capture saleable energy, plant availability factor (PAF), monthly generation, salient features of hydroelectric projects, and month-wise design energy/MW continuous for run-of-river stations (p4–8). F-3 computes gross and net annual fixed charges from interest, depreciation, lease charges, return on equity, O&M and working capital interest (p9).

Capital and financing forms cover gross fixed assets, asset-wise and aggregate depreciation, capital expenditure, capital works-in-progress, commissioning schedules, capital cost break-ups at COD, construction/supply/service package break-ups, drawdown schedules for IDC and financing charges, additional capitalisation, de-capitalised assets, reconciliation of ACE claims, and incidental expenditure during construction (p10–26). F-7 to F-9.3 address capital cost and financing structure, financial packages, outstanding loans, weighted average interest on actual loans and interest on normative loans (p27–32).

Operating cost forms F-10 to F-11.3 cover working capital interest, O&M, repair & maintenance, employee expenses and administration & general expenses (p33–37). F-12 captures non-tariff income (p38). F-13 provides truing-up/APR summaries, splitting deviations into controllable and uncontrollable, and F-14/F-14A compute return on equity (p39–41).

Many notes require supporting documents and explanations: UERC approvals, causes of cost or time overruns, cost-benefit analysis, and statutory-auditor certification (p15, p19, p23, p34). The document states no issue date, gazette date, enforcement date or regulation number; UERC is mentioned only in notes (p15).

Primary topics
Generation tariff, Tariff determination, Capital cost and investment

Read with this

The regulation

Commencement notices and reasons

Procedures and orders made under it

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document