Skip to content

UERC · Uttarakhand Electricity Regulatory Commission

SLDC Formats

Formats for SLDC

OrderDate not stated

Replaced by a later regulation Voltaic does not hold

Voltaic does not show the regulation that replaces it, so check the regulator's website for it.

Made under the Multi Year Tariff Regulations, 2018.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a compendium of blank filing formats — an SLDC's petition workbook — opening with a one-page index of 27 numbered forms (p1) and then setting out each form in turn. The only authority named is 'UERC' in the notes to Form F-6.1 (p14), which ask the filer to explain deviations from expenditure approved by UERC or other authorised agencies. Every form closes with the signature block 'Petitioner'.

The financial core is Forms F-1 to F-5 (p2–13): a summary Aggregate Revenue Requirement with O&M expenses, depreciation, interest and finance charges, interest on working capital, lease charges and return on equity; capital contributions, grants and subsidies; an O&M form splitting employee, administration and R&M costs with the sub-forms behind them — employee expense heads and cadre-wise headcount over six audited years (p5–6), A&G heads (p7), R&M asset classes (p8), gross fixed asset and asset-wise depreciation on an asset roll-forward (p9–12), and the RoE computation (p13).

Forms F-6.x to F-9 (p14–25) cover the capital side: capital expenditure with actual-versus-approved deviation explanations, capital works in progress, element-wise project cost, financial packages and financing structure, and a draw-down schedule for computing interest during construction, with debt and equity drawn on a pari passu basis (p23).

Forms F-10 to F-13 (p26–33) cover debt and cash items: outstanding loans including government and normative loans with repayment and overdue columns, weighted average interest on actual loans, interest on normative loan, working capital, the LDCD Fund fed by short-term open access and registration fee receipts (p32), and a three-year investment plan (p33).

Parts of the document are unusable: pages 15–16, 19–20 and 22 are missing, and several sub-forms listed in the index (F-6.1A, F-6.1B, F-6.4, F-6.5, F-6.7) do not appear in the text.

Primary topics
ARR and true-up, Capital cost and investment, Return, financing and working capital

Read with this

The regulation

Commencement notices and reasons

Procedures and orders made under it

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document