UERC · Uttarakhand Electricity Regulatory Commission
SLDC Formats
Formats for SLDC
OrderDate not stated
Replaced by a later regulation Voltaic does not hold
Voltaic does not show the regulation that replaces it, so check the regulator's website for it.
Made under the Multi Year Tariff Regulations, 2018.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a compendium of blank filing formats — an SLDC's petition workbook — opening with a one-page index of 27 numbered forms (p1) and then setting out each form in turn. The only authority named is 'UERC' in the notes to Form F-6.1 (p14), which ask the filer to explain deviations from expenditure approved by UERC or other authorised agencies. Every form closes with the signature block 'Petitioner'.
The financial core is Forms F-1 to F-5 (p2–13): a summary Aggregate Revenue Requirement with O&M expenses, depreciation, interest and finance charges, interest on working capital, lease charges and return on equity; capital contributions, grants and subsidies; an O&M form splitting employee, administration and R&M costs with the sub-forms behind them — employee expense heads and cadre-wise headcount over six audited years (p5–6), A&G heads (p7), R&M asset classes (p8), gross fixed asset and asset-wise depreciation on an asset roll-forward (p9–12), and the RoE computation (p13).
Forms F-6.x to F-9 (p14–25) cover the capital side: capital expenditure with actual-versus-approved deviation explanations, capital works in progress, element-wise project cost, financial packages and financing structure, and a draw-down schedule for computing interest during construction, with debt and equity drawn on a pari passu basis (p23).
Forms F-10 to F-13 (p26–33) cover debt and cash items: outstanding loans including government and normative loans with repayment and overdue columns, weighted average interest on actual loans, interest on normative loan, working capital, the LDCD Fund fed by short-term open access and registration fee receipts (p32), and a three-year investment plan (p33).
Parts of the document are unusable: pages 15–16, 19–20 and 22 are missing, and several sub-forms listed in the index (F-6.1A, F-6.1B, F-6.4, F-6.5, F-6.7) do not appear in the text.
Read with this
The regulation
- Dated 14 Sep 2018Multi Year Tariff Regulations, 2018
Amendments and corrections
Commencement notices and reasons
- Dated 14 Sep 2018Multi Year Tariff Regulations, 2018 — Statement of Reasons
Procedures and orders made under it
- Date not statedFormats for Distribution
- Date not statedFormats for Transmission
- Date not statedHydro Generation Formats
- Date not statedThermal/Gas Formats
Earlier drafts
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.