TNERC · Tamil Nadu Electricity Regulatory Commission
Power Procurement from New and Renewable Sources of Energy (Amendment) Regulations, 2012 — Draft
Power Procurement from New and Renewable Sources of Energy (Amendment) Regulations, 2012
Draft amendmentDated 4 Sep 2012TNERC / NCES Regn. / 16 /
Draft
A proposal that has since been finalised as the Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Amendment, 2013.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft TNERC notification proposing four amendments to the Commission's Power Procurement from New and Renewable Sources of Energy Regulations, 2008, which were notified in Part VI – Section 2 of the Tamil Nadu Government Gazette on 27 February 2008 (p1). It recites that the amendments are considered necessary and sets out a public-comment notice: the proposed amendments will be published in the Tamil Nadu Government Gazette after fifteen days from the date of hosting on the Commission's website, and suggestions, modifications or objections sent to the Secretary at the Chennai address within that period will be taken into consideration (p1). The proposed amending regulations are to be cited as the Power Procurement from New and Renewable Sources of Energy (Amendment) Regulations, 2012, and would come into force on the date of their publication in the Tamil Nadu Government Gazette (p1–2).
Substantively, clause 2 substitutes regulation 3(3) of the Principal Regulations to specify who provides evacuation facilities and how interconnection cost is shared: the STU or distribution licensee provides evacuation as per the Commission's Intra State Open Access Regulations 2005, the CEA (Technical Standards for connectivity to the Grid) Regulations, 2007 and the Tamil Nadu Electricity Grid Code, while the generator bears the cost of switchgear, metering, protection and related equipment from the generation point to the interconnection point, and the entire cost of interface lines (p2).
Clause 3 drops the words "and allied issues" from regulation 6 (p2). Clause 4 replaces the provision on the Energy Purchase Agreement / Energy Wheeling Agreement format so that distribution licensees must file a model EPA/EWA, discussed with generators or open access customers, for Commission approval within one month of the Commission's tariff order, instead of the format being evolved by the Commission itself (p2). Clause 5 removes the word "incentive/" from regulation 8(8) (p3). The document is signed by the Secretary by order of the Commission (p3).
Read with this
The regulation
Amendments and corrections
- Dated 1 Dec 2008Power Procurement from New and Renewable Sources of Energy (First Amendment) Regulations, 2008
- Dated 24 Dec 2008Power Procurement from New and Renewable Sources of Energy (Second Amendment) Regulations, 2008
- Dated 8 Jun 2009Power Procurement from New and Renewable Sources of Energy (Second Amendment) Regulations, 2009
- Dated 7 Jan 2010Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Consolidated as amended up to 31.12.2009
- Dated 18 Mar 2011Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Consolidated to 31-12-2010
- Dated 1 Jul 2011Power Procurement from New and Renewable Sources of Energy (Amendment) Regulations, 2011
- Dated 19 Jan 2013Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Amendment, 2013
Proposed changes (drafts with no final yet)
Earlier drafts
9 more documents belong here and are not on Voltaic: 8 copies in another language and 1 draft or notice on a draft.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.