Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Power Procurement from New and Renewable Sources of Energy (Amendment) Regulations, 2012 — Draft

Power Procurement from New and Renewable Sources of Energy (Amendment) Regulations, 2012

Draft amendmentDated 4 Sep 2012TNERC / NCES Regn. / 16 /

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft TNERC notification proposing four amendments to the Commission's Power Procurement from New and Renewable Sources of Energy Regulations, 2008, which were notified in Part VI – Section 2 of the Tamil Nadu Government Gazette on 27 February 2008 (p1). It recites that the amendments are considered necessary and sets out a public-comment notice: the proposed amendments will be published in the Tamil Nadu Government Gazette after fifteen days from the date of hosting on the Commission's website, and suggestions, modifications or objections sent to the Secretary at the Chennai address within that period will be taken into consideration (p1). The proposed amending regulations are to be cited as the Power Procurement from New and Renewable Sources of Energy (Amendment) Regulations, 2012, and would come into force on the date of their publication in the Tamil Nadu Government Gazette (p1–2).

Substantively, clause 2 substitutes regulation 3(3) of the Principal Regulations to specify who provides evacuation facilities and how interconnection cost is shared: the STU or distribution licensee provides evacuation as per the Commission's Intra State Open Access Regulations 2005, the CEA (Technical Standards for connectivity to the Grid) Regulations, 2007 and the Tamil Nadu Electricity Grid Code, while the generator bears the cost of switchgear, metering, protection and related equipment from the generation point to the interconnection point, and the entire cost of interface lines (p2).

Clause 3 drops the words "and allied issues" from regulation 6 (p2). Clause 4 replaces the provision on the Energy Purchase Agreement / Energy Wheeling Agreement format so that distribution licensees must file a model EPA/EWA, discussed with generators or open access customers, for Commission approval within one month of the Commission's tariff order, instead of the format being evolved by the Commission itself (p2). Clause 5 removes the word "incentive/" from regulation 8(8) (p3). The document is signed by the Secretary by order of the Commission (p3).

Standard name
Power Procurement Regulations
Primary topics
Power procurement and PPAs

Read with this

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document