TNERC · Tamil Nadu Electricity Regulatory Commission
Power Procurement from New and Renewable Sources of Energy (Second Amendment) Regulations, 2009
AmendmentDated 8 Jun 2009TNERC / NCES Regn. / 16 / 5 dated 08.06.2009
Amends the Power Procurement from New and Renewable Sources of Energy Regulations, 2008.
Summary
Summary written by software. Check the regulator's original before you rely on it.
A short amending instrument. After reciting that the Tamil Nadu Electricity Regulatory Commission notified the Power Procurement from New and Renewable Sources of Energy Regulations, 2008 under s.61(h), s.86(1)(e) and s.181 of the Electricity Act 2003, and published them in the Tamil Nadu Government Gazette dated 27 February 2008 (p1), the Commission makes one substantive change. In the second proviso to regulation 3(3) of the principal regulations, the expression "entire cost of interfacing lines" is replaced by "depreciated (Written down value) cost of interfacing lines" (p2). The amending regulations are named the Second Amendment Regulations, 2009 and come into force on publication in the Tamil Nadu Government Gazette — that Gazette date is not printed (p1–2). Regulation 1 carries the short title and commencement; the document closes with the Secretary signing by order of the Commission (p2).
Read with this
The regulation
Amendments and corrections
- Dated 1 Dec 2008Power Procurement from New and Renewable Sources of Energy (First Amendment) Regulations, 2008
- Dated 24 Dec 2008Power Procurement from New and Renewable Sources of Energy (Second Amendment) Regulations, 2008
- Dated 7 Jan 2010Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Consolidated as amended up to 31.12.2009
- Dated 18 Mar 2011Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Consolidated to 31-12-2010
- Dated 1 Jul 2011Power Procurement from New and Renewable Sources of Energy (Amendment) Regulations, 2011
- Dated 19 Jan 2013Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Amendment, 2013
Proposed changes (drafts with no final yet)
Earlier drafts
9 more documents belong here and are not on Voltaic: 8 copies in another language and 1 draft or notice on a draft.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.