TNERC · Tamil Nadu Electricity Regulatory Commission
Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Consolidated as amended up to 31.12.2009
The Power Procurement from New and Renewable Sources of Energy Regulations, 2008.
AmendmentDated 7 Jan 2010In force from 15 May 2006TNERC/NCES Regn./16/7 dated 7.1.2010
Amends the Power Procurement from New and Renewable Sources of Energy Regulations, 2008.
Summary
Summary written by software. Check the regulator's original before you rely on it.
What this document is. TNERC's consolidated re-publication of its Power Procurement from New and Renewable Sources of Energy Regulations 2008, issued as Notification No. TNERC/NCES Regn./16/7 dated 7.1.2010 (p1). The Commission lists the 2008 principal regulations and six amending notifications and says it is re-publishing them with the amendments folded in, up to 31 December 2009, so that the public has one up-to-date text (p1–2). The document therefore has two layers: a short re-publication notice, and the full regulation text that follows, with every inserted, substituted or omitted provision flagged in footnotes naming the amending notification and its effective date (p4–8).
What the regulations do. They are deemed to have come into force on 15 May 2006 and apply to new and renewable source based plants, including co-generation, in Tamil Nadu whose PPAs were signed on or after that date; earlier contracts continue but may be renegotiated by mutual option (p2–3). Regulation 2 defines the working vocabulary — cogeneration, firm and infirm power, interconnection point, interface line, and what counts as a new and renewable source (p3–4).
Regulation 3 obliges each distribution licensee to buy a minimum share of energy from renewables, the percentage being left to Commission orders issued from time to time and reported through the ARR (p4); it also caps conventional fuel use in bagasse/biomass plants, allocates evacuation and interfacing-line duties and costs between the STU/distribution licensee and the generator, and contemplates banking and payment procedures (p5–6).
Regulation 4 sets out how tariffs are determined — the process, the external principles the Commission follows, technology-linked allowances and disincentives, financial and operational parameters, case-by-case treatment for small hydro, and adoption of tariffs discovered through s.63 bidding (p6–7). Regulation 5 lets the Commission levy charges for adjustment of wheeled energy; Regulation 6 fixes the agreement period and control period; Regulation 7 covers EPA and EWA formats and monthly reporting of executed agreements; Regulation 8 lists the heads on which criteria and charges for sale to the licensee, captive use and third-party sale may be fixed (p8–9). Regulations 9 and 10 give the Commission power to remove difficulties and to amend the regulations (p9).
Read with this
The regulation
Amendments and corrections
- Dated 1 Dec 2008Power Procurement from New and Renewable Sources of Energy (First Amendment) Regulations, 2008
- Dated 24 Dec 2008Power Procurement from New and Renewable Sources of Energy (Second Amendment) Regulations, 2008
- Dated 8 Jun 2009Power Procurement from New and Renewable Sources of Energy (Second Amendment) Regulations, 2009
- Dated 18 Mar 2011Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Consolidated to 31-12-2010
- Dated 1 Jul 2011Power Procurement from New and Renewable Sources of Energy (Amendment) Regulations, 2011
- Dated 19 Jan 2013Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Amendment, 2013
Proposed changes (drafts with no final yet)
Earlier drafts
9 more documents belong here and are not on Voltaic: 8 copies in another language and 1 draft or notice on a draft.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.