TNERC · Tamil Nadu Electricity Regulatory Commission
Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Amendment, 2013
Amendment to the Power Procurement from New and Renewable Sources of Energy Regulations, 2008
AmendmentDated 19 Jan 2013TNERC / NCES Regn /16/11 dated 19-01-2013
Amends the Power Procurement from New and Renewable Sources of Energy Regulations, 2008.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a short TNERC amendment — notification no. TNERC / NCES Regn /16/11, dated 19-01-2013 — making four changes to the Power Procurement from New and Renewable Sources of Energy Regulations, 2008, packaged with an explanatory statement and a side-by-side comparison table (p1, p3–5).
The operative part (p1–2) substitutes regulation 3(3) so the generator, rather than the licensee, provides evacuation facilities from the point of generation to the interconnection point — including metering, protection and the interface line — in line with the Commission's Intra State Open Access Regulations, the CEA Technical Standards for Grid Connectivity and the Tamil Nadu Electricity Grid Code. It deletes the words "and allied issues" from regulation 6; rewrites regulation 7 so that distribution licensees, not the Commission, must file a model Energy Purchase Agreement / Energy Wheeling Agreement — discussed with generators and open access customers — for Commission approval within one month of the Commission issuing a tariff order; and drops the word "incentive/" from item (8) of regulation 8.
The explanatory statement (p3) gives the reasoning: the existing provisos to regulation 3(3) are inconsistent with section 10(1) of the Electricity Act 2003; a tariff revision binds only generators commissioned after the revised order, whereas allied issues bind all NCES generators; licensees are better placed to draft EPA/EWA, though the Commission still approves the model after taking stakeholder views; and the power factor incentive has been withdrawn, consistent with an amendment already made in the Distribution Code.
Pages 4–5 set out the existing and amended provisions side by side for regulations 3, 6, 7 and 8.
Read with this
The regulation
Amendments and corrections
- Dated 1 Dec 2008Power Procurement from New and Renewable Sources of Energy (First Amendment) Regulations, 2008
- Dated 24 Dec 2008Power Procurement from New and Renewable Sources of Energy (Second Amendment) Regulations, 2008
- Dated 8 Jun 2009Power Procurement from New and Renewable Sources of Energy (Second Amendment) Regulations, 2009
- Dated 7 Jan 2010Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Consolidated as amended up to 31.12.2009
- Dated 18 Mar 2011Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Consolidated to 31-12-2010
- Dated 1 Jul 2011Power Procurement from New and Renewable Sources of Energy (Amendment) Regulations, 2011
Proposed changes (drafts with no final yet)
Earlier drafts
9 more documents belong here and are not on Voltaic: 8 copies in another language and 1 draft or notice on a draft.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.