Power Procurement from New and Renewable Sources of Energy (First Amendment) Regulations, 2008

AmendmentDated 1 Dec 2008TNERC / NCES Regn. /16 /2 dated 01.12.2008

Amends the Power Procurement from New and Renewable Sources of Energy Regulations, 2008.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is TNERC's first amendment to its Power Procurement from New and Renewable Sources of Energy Regulations, 2008, issued as Notification No. TNERC/NCES Regn./16/2 dated 01.12.2008 (p1). It is a very short instrument — two regulations — and the operative change is confined to a single sub-regulation of the parent 2008 Regulations, which were notified under Notification No. TNERC/NCES Regn./16/1 dated 8.2.2008 and published in the Tamil Nadu Government Gazette of 27 February 2008 (p1).

Regulation 1 gives the short title — the Power Procurement from New and Renewable Sources of Energy (First Amendment) Regulations, 2008 — and ties commencement to the date of publication in the Tamil Nadu Government Gazette (p1). That Gazette date is not printed in the text, so the exact commencement date cannot be read off the document itself.

Regulation 2 inserts two provisos into sub-regulation (3) of regulation 3 of the parent Regulations (p2). The first proviso allocates the cost of interfacing lines up to the interconnection point to the STU or distribution licensee where a new and renewable source based generator sells its entire output to the distribution licensee. The second proviso is a claw-back: if such a generator, before the period fixed in its EPA expires, diverts that power to captive use, to a third person, or to a distribution licensee other than the one it contracted with, it must reimburse the entire cost of the interfacing lines to that contracting licensee before wheeling begins.

No other provision of the parent Regulations is touched, and the amendment creates no schedules, formats or procedures of its own. Its practical reach is narrow but pointed: it settles who pays for the interconnection assets in the full-output sale model, and penalises generators who switch the power away from that sale.

Standard name
Power Procurement Regulations
Primary topics
Power procurement and PPAs, Connection and miscellaneous charges

Read with this

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document