TNERC · Tamil Nadu Electricity Regulatory Commission
Power Procurement from New and Renewable Sources of Energy (First Amendment) Regulations, 2008
AmendmentDated 1 Dec 2008TNERC / NCES Regn. /16 /2 dated 01.12.2008
Amends the Power Procurement from New and Renewable Sources of Energy Regulations, 2008.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is TNERC's first amendment to its Power Procurement from New and Renewable Sources of Energy Regulations, 2008, issued as Notification No. TNERC/NCES Regn./16/2 dated 01.12.2008 (p1). It is a very short instrument — two regulations — and the operative change is confined to a single sub-regulation of the parent 2008 Regulations, which were notified under Notification No. TNERC/NCES Regn./16/1 dated 8.2.2008 and published in the Tamil Nadu Government Gazette of 27 February 2008 (p1).
Regulation 1 gives the short title — the Power Procurement from New and Renewable Sources of Energy (First Amendment) Regulations, 2008 — and ties commencement to the date of publication in the Tamil Nadu Government Gazette (p1). That Gazette date is not printed in the text, so the exact commencement date cannot be read off the document itself.
Regulation 2 inserts two provisos into sub-regulation (3) of regulation 3 of the parent Regulations (p2). The first proviso allocates the cost of interfacing lines up to the interconnection point to the STU or distribution licensee where a new and renewable source based generator sells its entire output to the distribution licensee. The second proviso is a claw-back: if such a generator, before the period fixed in its EPA expires, diverts that power to captive use, to a third person, or to a distribution licensee other than the one it contracted with, it must reimburse the entire cost of the interfacing lines to that contracting licensee before wheeling begins.
No other provision of the parent Regulations is touched, and the amendment creates no schedules, formats or procedures of its own. Its practical reach is narrow but pointed: it settles who pays for the interconnection assets in the full-output sale model, and penalises generators who switch the power away from that sale.
Read with this
The regulation
Amendments and corrections
- Dated 24 Dec 2008Power Procurement from New and Renewable Sources of Energy (Second Amendment) Regulations, 2008
- Dated 8 Jun 2009Power Procurement from New and Renewable Sources of Energy (Second Amendment) Regulations, 2009
- Dated 7 Jan 2010Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Consolidated as amended up to 31.12.2009
- Dated 18 Mar 2011Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Consolidated to 31-12-2010
- Dated 1 Jul 2011Power Procurement from New and Renewable Sources of Energy (Amendment) Regulations, 2011
- Dated 19 Jan 2013Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Amendment, 2013
Proposed changes (drafts with no final yet)
Earlier drafts
9 more documents belong here and are not on Voltaic: 8 copies in another language and 1 draft or notice on a draft.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.