Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Amendment, 2011 — Draft

Power Procurement from New and Renewable Sources of Energy (Amendment) Regulations, 2011

Draft amendmentDated 9 Aug 2011TNERC / NCES Regn. / 16 / 10 dated -08-2011

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page draft amending notification from the Tamil Nadu Electricity Regulatory Commission, circulated for public comment before 25 August 2011 (p1). If made, it would amend the Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — notified as TNERC/NCES Regn./16/1 of 8 February 2008 and gazetted on 27 February 2008 (p1).

The draft has two operative clauses. Clause 1 gives the title — Power Procurement from New and Renewable Sources of Energy (Amendment) Regulations, 2011 — and provides that the amendments take effect on publication in the Tamil Nadu Government Gazette (p1). Clause 2 substitutes regulation 3(3) of the Principal Regulations outright (p2).

The substituted sub-regulation places the duty to provide evacuation facilities on the State Transmission Utility and the distribution licensee, to be discharged in line with the Commission's Intra State Open Access Regulations, 2005, the CEA (Technical Standards for Connectivity to the Grid) Regulations, 2007 and the Tamil Nadu Electricity Grid Code. It also allocates cost: switchgear, metering, protection and related equipment from the point of generation to the interconnection point, together with interface lines, are to be borne by generators (p2).

Only this single sub-regulation is touched; the rest of the 2008 framework is left unamended. Because the document is a draft, nothing in it is yet in force (p1–2).

Standard name
Power Procurement Regulations
Primary topics
Connectivity and GNA

Read with this

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗