TNERC · Tamil Nadu Electricity Regulatory Commission
Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Amendment, 2011 — Draft
Power Procurement from New and Renewable Sources of Energy (Amendment) Regulations, 2011
Draft amendmentDated 9 Aug 2011TNERC / NCES Regn. / 16 / 10 dated -08-2011
Draft
A proposal that has since been finalised as the Power Procurement from New and Renewable Sources of Energy (Amendment) Regulations, 2011.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a two-page draft amending notification from the Tamil Nadu Electricity Regulatory Commission, circulated for public comment before 25 August 2011 (p1). If made, it would amend the Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — notified as TNERC/NCES Regn./16/1 of 8 February 2008 and gazetted on 27 February 2008 (p1).
The draft has two operative clauses. Clause 1 gives the title — Power Procurement from New and Renewable Sources of Energy (Amendment) Regulations, 2011 — and provides that the amendments take effect on publication in the Tamil Nadu Government Gazette (p1). Clause 2 substitutes regulation 3(3) of the Principal Regulations outright (p2).
The substituted sub-regulation places the duty to provide evacuation facilities on the State Transmission Utility and the distribution licensee, to be discharged in line with the Commission's Intra State Open Access Regulations, 2005, the CEA (Technical Standards for Connectivity to the Grid) Regulations, 2007 and the Tamil Nadu Electricity Grid Code. It also allocates cost: switchgear, metering, protection and related equipment from the point of generation to the interconnection point, together with interface lines, are to be borne by generators (p2).
Only this single sub-regulation is touched; the rest of the 2008 framework is left unamended. Because the document is a draft, nothing in it is yet in force (p1–2).
Read with this
The regulation
Amendments and corrections
- Dated 1 Dec 2008Power Procurement from New and Renewable Sources of Energy (First Amendment) Regulations, 2008
- Dated 24 Dec 2008Power Procurement from New and Renewable Sources of Energy (Second Amendment) Regulations, 2008
- Dated 8 Jun 2009Power Procurement from New and Renewable Sources of Energy (Second Amendment) Regulations, 2009
- Dated 7 Jan 2010Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Consolidated as amended up to 31.12.2009
- Dated 18 Mar 2011Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Consolidated to 31-12-2010
- Dated 1 Jul 2011Power Procurement from New and Renewable Sources of Energy (Amendment) Regulations, 2011
- Dated 19 Jan 2013Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Amendment, 2013
Proposed changes (drafts with no final yet)
Earlier drafts
9 more documents belong here and are not on Voltaic: 8 copies in another language and 1 draft or notice on a draft.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.