TNERC · Tamil Nadu Electricity Regulatory Commission
Non-Conventional Energy Generation Sources Tariff Regulations, 2026 — Draft
Tamil Nadu Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff from Non-Conventional Energy Generation Sources) Regulations, 2026
Draft regulationDated 1 Jun 2026TNERC/TR-NCEGS/2026/....... dated 01-06-2026
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is TNERC's draft tariff regulation for non-conventional energy generation, published for comment with a deadline of 16-06-2026 (p1). It proposes a single framework to determine tariffs for grid-connected renewable and non-conventional projects commissioned during the FY 2027-28 to FY 2031-32 control period (p1, p6, p9). Chapter 1 defines the technologies and eligibility conditions, applies the regulation to Tamil Nadu and excludes captive plants unless they seek a tariff for surplus sale (p6-20). Chapter 2 sets the procurement route: competitive bidding under section 63 is ordinarily preferred, with generic or project-specific cost-plus tariffs under section 62 where bidding is not feasible; bagasse co-generation is carved out of bidding (p20-24). It also covers tariff petitions, tariff structure (single-part fixed cost, two-part for fuel-based projects), levelised tariff design and must-run treatment (p24-29). Chapter 3 lays down financial norms - capital cost, debt-equity, loan tenure and interest, depreciation, return on equity, working capital, O&M, rebate, late payment surcharge, carbon credit sharing, reactive energy, subsidies and taxes (p30-39). Chapters 4 to 10 set technology-specific parameters and scope for solar, wind, biomass, small hydro, waste-to-energy, hybrid and storage projects, including repowering, BESS and pumped hydro storage (p40-70). Chapter 11 contains common provisions on RPO, PPAs and PSAs, forecasting/scheduling/deviation settlement and grid connectivity (p71-74). Chapter 12 covers deviations from norms, tariff by mutual agreement, dispute resolution, power to relax, savings, practice directions, amendment and removal of difficulties (p75-77). Annexure-1 gives generic tariffs for the control period and LCOE computations for each technology (p78-117). A Statement of Reasons explains the consolidation rationale, key features and the historical progression of bagasse co-generation parameters (p118-122).
Read with this
The regulation
Amendments and corrections
- Dated 1 Dec 2008Power Procurement from New and Renewable Sources of Energy (First Amendment) Regulations, 2008
- Dated 24 Dec 2008Power Procurement from New and Renewable Sources of Energy (Second Amendment) Regulations, 2008
- Dated 8 Jun 2009Power Procurement from New and Renewable Sources of Energy (Second Amendment) Regulations, 2009
- Dated 7 Jan 2010Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Consolidated as amended up to 31.12.2009
- Dated 18 Mar 2011Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Consolidated to 31-12-2010
- Dated 1 Jul 2011Power Procurement from New and Renewable Sources of Energy (Amendment) Regulations, 2011
- Dated 19 Jan 2013Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Amendment, 2013
Earlier drafts
9 more documents belong here and are not on Voltaic: 8 copies in another language and 1 draft or notice on a draft.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.