Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Consolidated to 31-12-2010

The Power Procurement from New and Renewable Sources of Energy Regulations, 2008

AmendmentDated 18 Mar 2011Published in the Gazette 13 Apr 2011In force from 15 May 2006TNERC/NCES Regn./16/9 dated 18-03-2011

Amends the Power Procurement from New and Renewable Sources of Energy Regulations, 2008.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Tamil Nadu Electricity Regulatory Commission's consolidated republication of its Power Procurement from New and Renewable Sources of Energy Regulations, 2008, carried in the State Gazette of 13 April 2011 under notification 16/9 dated 18 March 2011 (p1–2). The Commission says it is reprinting the regulations with every amendment up to 31 December 2010 folded in, so that the public has one current, comprehensible text; it lists the original 2008 notification and the seven amending or republishing notifications that came before (p2–3). It is not itself a new set of obligations — it is the operative rulebook as it stood on that date, with footnotes showing what each amendment changed.

Regulations 1–3 (p3–4) give the short title, backdate commencement to 15 May 2006 to match the Commission's Order No. 3 of that date, and apply the regime to new and renewable plants including cogeneration in Tamil Nadu whose purchase agreements were signed on or after that date; older contracts survive but may be mutually renegotiated. They define firm and infirm power, interconnection point and interface line, require each distribution licensee to buy a minimum renewable share as fixed by Commission orders from time to time and to report it in its ARR, cap conventional fuel use in bagasse/biomass plants, and allocate the cost and execution of evacuation and interfacing works between the generator and the STU or licensee, with reimbursement where a generator diverts power away from a full-sale agreement.

Regulation 4 (p4–5) sets the tariff-determination process — suo motu or on application, public response, then a general or specific tariff order — guided by CERC, national policies and the Forum of Regulators, with case-by-case tariffs for small hydro between 5 MW and 25 MW and adoption of tariffs found through section 63 bidding. Regulations 5–8 (p5–6) cover charges for adjusting wheeled energy, the agreement and control period, the EPA/EWA formats and the monthly filing of executed agreements with fees, and the list of charges and issues the Commission may settle for captive use and third-party sale. Regulations 9–10 (p6) are the powers to remove difficulties and to amend.

Standard name
Renewable Energy Tariff Regulations, Power Procurement Regulations
Primary topics
Power procurement and PPAs, Renewable energy tariff, Renewable purchase obligation (RPO / RCO)

Read with this

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗