TNERC · Tamil Nadu Electricity Regulatory Commission
Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Consolidated to 31-12-2010
The Power Procurement from New and Renewable Sources of Energy Regulations, 2008
AmendmentDated 18 Mar 2011Published in the Gazette 13 Apr 2011In force from 15 May 2006TNERC/NCES Regn./16/9 dated 18-03-2011
Amends the Power Procurement from New and Renewable Sources of Energy Regulations, 2008.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Tamil Nadu Electricity Regulatory Commission's consolidated republication of its Power Procurement from New and Renewable Sources of Energy Regulations, 2008, carried in the State Gazette of 13 April 2011 under notification 16/9 dated 18 March 2011 (p1–2). The Commission says it is reprinting the regulations with every amendment up to 31 December 2010 folded in, so that the public has one current, comprehensible text; it lists the original 2008 notification and the seven amending or republishing notifications that came before (p2–3). It is not itself a new set of obligations — it is the operative rulebook as it stood on that date, with footnotes showing what each amendment changed.
Regulations 1–3 (p3–4) give the short title, backdate commencement to 15 May 2006 to match the Commission's Order No. 3 of that date, and apply the regime to new and renewable plants including cogeneration in Tamil Nadu whose purchase agreements were signed on or after that date; older contracts survive but may be mutually renegotiated. They define firm and infirm power, interconnection point and interface line, require each distribution licensee to buy a minimum renewable share as fixed by Commission orders from time to time and to report it in its ARR, cap conventional fuel use in bagasse/biomass plants, and allocate the cost and execution of evacuation and interfacing works between the generator and the STU or licensee, with reimbursement where a generator diverts power away from a full-sale agreement.
Regulation 4 (p4–5) sets the tariff-determination process — suo motu or on application, public response, then a general or specific tariff order — guided by CERC, national policies and the Forum of Regulators, with case-by-case tariffs for small hydro between 5 MW and 25 MW and adoption of tariffs found through section 63 bidding. Regulations 5–8 (p5–6) cover charges for adjusting wheeled energy, the agreement and control period, the EPA/EWA formats and the monthly filing of executed agreements with fees, and the list of charges and issues the Commission may settle for captive use and third-party sale. Regulations 9–10 (p6) are the powers to remove difficulties and to amend.
Read with this
The regulation
Amendments and corrections
- Dated 1 Dec 2008Power Procurement from New and Renewable Sources of Energy (First Amendment) Regulations, 2008
- Dated 24 Dec 2008Power Procurement from New and Renewable Sources of Energy (Second Amendment) Regulations, 2008
- Dated 8 Jun 2009Power Procurement from New and Renewable Sources of Energy (Second Amendment) Regulations, 2009
- Dated 7 Jan 2010Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Consolidated as amended up to 31.12.2009
- Dated 1 Jul 2011Power Procurement from New and Renewable Sources of Energy (Amendment) Regulations, 2011
- Dated 19 Jan 2013Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Amendment, 2013
Proposed changes (drafts with no final yet)
Earlier drafts
9 more documents belong here and are not on Voltaic: 8 copies in another language and 1 draft or notice on a draft.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.