Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Intra-State Open Access Regulations, 2021 — Second Amendment, 2023

Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access in Madhya Pradesh) Regulations, (Revision-I) 2021 (Second Amendment) {ARG-24(I)(ii) of 2023}

AmendmentDated 5 Apr 2023No. MPERC/2023/730 dated 5th April 2023

Amends the Intra-State Open Access Regulations, 2021 (Revision-I).

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Madhya Pradesh Electricity Regulatory Commission's Second Amendment to its 2021 intra-state open access regulations, issued at Bhopal on 5 April 2023 (p1), rewrites three areas of the principal regulations: definitions, open access charges, and the priority order for adjusting energy credit.

Clause 2 (p1–2) inserts four definitions into Regulation 2 — Day Ahead Market, Fossil Fuel, Green Energy and Green Energy Open Access Consumer — each by cross-reference to the Commission's 2023 methodology regulations for Green Energy Open Access charges and banking charges (G-46 of 2023), as amended from time to time, rather than defining them afresh.

Clause 3 (p2–4) is the operative charges package. It caps the cross-subsidy surcharge, both in the general open access clause 13A and again in the Green Energy Open Access clause 13B, and bars additional surcharge where a person draws power from a captive generating plant for own use. Two further additional-surcharge carve-outs are added in clause 13B: non-fossil-fuel waste-to-energy plants (exempt from both cross-subsidy surcharge and additional surcharge) and offshore wind projects commissioned up to December 2025. It restates which charges Green Energy Open Access consumers pay, and reworks standby charges — who specifies them, an exemption triggered by notice before Day Ahead Market gate closure on D-1, a ceiling relative to the applicable consumer-category tariff, and confirmation that standby charges sit on top of the tariff on standby energy.

Clause 4 (p4) substitutes Regulation 15 wholesale, setting a nine-step descending priority for adjusting an open access customer's energy drawl from different sources in each time block, after adjustment of losses, with pro-rata adjustment where more than one source falls in the same category.

The amendment commences on publication in the Madhya Pradesh Gazette — the Gazette date is not printed (p1) — and extends to the whole of Madhya Pradesh (p1).

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges, Energy accounting and settlement

Read with this

The regulation

Commencement notices and reasons

7 more documents belong here and are not on Voltaic: 7 copies in another language.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗