MPERC · Madhya Pradesh Electricity Regulatory Commission
Intra-State Open Access Regulations, 2021 — Second Amendment, 2023
Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access in Madhya Pradesh) Regulations, (Revision-I) 2021 (Second Amendment) {ARG-24(I)(ii) of 2023}
AmendmentDated 5 Apr 2023No. MPERC/2023/730 dated 5th April 2023
Amends the Intra-State Open Access Regulations, 2021 (Revision-I).
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Madhya Pradesh Electricity Regulatory Commission's Second Amendment to its 2021 intra-state open access regulations, issued at Bhopal on 5 April 2023 (p1), rewrites three areas of the principal regulations: definitions, open access charges, and the priority order for adjusting energy credit.
Clause 2 (p1–2) inserts four definitions into Regulation 2 — Day Ahead Market, Fossil Fuel, Green Energy and Green Energy Open Access Consumer — each by cross-reference to the Commission's 2023 methodology regulations for Green Energy Open Access charges and banking charges (G-46 of 2023), as amended from time to time, rather than defining them afresh.
Clause 3 (p2–4) is the operative charges package. It caps the cross-subsidy surcharge, both in the general open access clause 13A and again in the Green Energy Open Access clause 13B, and bars additional surcharge where a person draws power from a captive generating plant for own use. Two further additional-surcharge carve-outs are added in clause 13B: non-fossil-fuel waste-to-energy plants (exempt from both cross-subsidy surcharge and additional surcharge) and offshore wind projects commissioned up to December 2025. It restates which charges Green Energy Open Access consumers pay, and reworks standby charges — who specifies them, an exemption triggered by notice before Day Ahead Market gate closure on D-1, a ceiling relative to the applicable consumer-category tariff, and confirmation that standby charges sit on top of the tariff on standby energy.
Clause 4 (p4) substitutes Regulation 15 wholesale, setting a nine-step descending priority for adjusting an open access customer's energy drawl from different sources in each time block, after adjustment of losses, with pro-rata adjustment where more than one source falls in the same category.
The amendment commences on publication in the Madhya Pradesh Gazette — the Gazette date is not printed (p1) — and extends to the whole of Madhya Pradesh (p1).
Read with this
The regulation
- Dated 14 Dec 2021Intra-State Open Access Regulations, 2021 (Revision-I)
Amendments and corrections
- Dated 16 Jan 2023Madhya Pradesh Intra-State Open Access Regulations, 2021 — First Amendment, 2023
- Dated 26 Jul 2023Intra-State Open Access (Revision-I) Regulations, 2021 — Third Amendment, 2023
- Dated 24 May 2024Intra-State Open Access Regulations, 2021 — Fourth Amendment, 2024
- Dated 4 Mar 2025Intra-State Open Access Regulations, 2021 (Revision-I) — Fifth Amendment, 2025
- Dated 7 Mar 2025MP Gazette Notification dated 07-MARCH-2025
- Dated 20 Jan 2026Intra-State Open Access Regulations, 2021 — Sixth Amendment, 2026
Commencement notices and reasons
- Dated 20 Jan 2026MP Gazette Notification dated 23 January 2026
7 more documents belong here and are not on Voltaic: 7 copies in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.