MPERC · Madhya Pradesh Electricity Regulatory Commission

Intra-State Open Access Regulations, 2021 — Fourth Amendment, 2024

Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access in Madhya Pradesh) Regulations, (Revision-I) 2021 (Fourth Amendment) {ARG-24(I)(iv) of 2024}

AmendmentDated 24 May 2024MPERC / 2024/1236 dated 24th May 2024

Amends the Intra-State Open Access Regulations, 2021 (Revision-I).

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page amendment issued by the Madhya Pradesh Electricity Regulatory Commission at Bhopal on 24 May 2024, amending the Commission's 2021 regulations on intra-state open access in Madhya Pradesh (p1). It is the fourth amendment to those Principal Regulations and comes into force from publication in the Madhya Pradesh Gazette, a date the document does not print (p1).

Clause 2 inserts new provisos into Regulation 13(A) of the Principal Regulations, which deals with additional surcharge. The provisos make the levy turn on whether the open access consumer's draw stays within, or exceeds, its contract demand with the distribution licensee and on whether fixed charges on that demand are paid; they also confine the surcharge to consumers who are, or have been, consumers of the concerned distribution licensee (p1). Clause 2.2 substitutes the second proviso to Regulation 13(B)(ii) with a parallel set of provisos applying the same contract-demand test to green energy open access consumers (p1–2).

Clause 3 inserts a further proviso into Regulation 15 providing that no adjustment in maximum demand is given where a person draws open access power only up to its contract demand with the distribution licensee (p2).

The amendment creates no forms, fees or procedures; it is a short set of substantive provisos reshaping the treatment of additional surcharge and maximum demand for open access consumers in the state.

Standard name
Open Access Regulations
Primary topics
Open access charges, Green energy open access

Read with this

The regulation

Commencement notices and reasons

7 more documents belong here and are not on Voltaic: 7 copies in another language.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document