MPERC · Madhya Pradesh Electricity Regulatory Commission
Intra-State Open Access Regulations, 2021 (Revision-I) — Fifth Amendment, 2025
Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access in Madhya Pradesh) Regulations, 2021 (Revision-I) (Fifth Amendment) {ARG-24(I)(v) of 2025}
AmendmentDated 4 Mar 2025No. MPERC/2024/424 dated 04/03/2025
Amends the Intra-State Open Access Regulations, 2021 (Revision-I).
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a one-page, single-clause amendment issued by the Madhya Pradesh Electricity Regulatory Commission, Bhopal, dated 04/03/2025 (p1). It inserts a new sixth proviso into sub-clause 3.3 of Regulation 3 of the MPERC (Terms and Conditions for Intra-State Open Access in Madhya Pradesh) Regulations, 2021 (Revision-I), which it calls the Principal Regulations.
The inserted proviso bars intra-state short-term open access for energy other than green energy where the power is to be transmitted and/or wheeled to the premises of an obligated entity that has not complied with its renewable purchase obligation for the previous financial year (p1). The restriction is expressly subject to Regulation 15 of the MPERC (Cogeneration and Generation of Electricity from Renewable Sources of Energy) (Revision-II) Regulations, 2021, as amended from time to time (p1).
Clause 1 supplies the short title, commencement and extent: the amendment takes effect from the date of publication in the Madhya Pradesh Gazette and extends to the whole state, but the Gazette date is not printed here, so the operative date cannot be fixed from this text alone (p1).
Read with this
The regulation
- Dated 14 Dec 2021Intra-State Open Access Regulations, 2021 (Revision-I)
Amendments and corrections
- Dated 16 Jan 2023Madhya Pradesh Intra-State Open Access Regulations, 2021 — First Amendment, 2023
- Dated 5 Apr 2023Intra-State Open Access Regulations, 2021 — Second Amendment, 2023
- Dated 26 Jul 2023Intra-State Open Access (Revision-I) Regulations, 2021 — Third Amendment, 2023
- Dated 24 May 2024Intra-State Open Access Regulations, 2021 — Fourth Amendment, 2024
- Dated 7 Mar 2025MP Gazette Notification dated 07-MARCH-2025
- Dated 20 Jan 2026Intra-State Open Access Regulations, 2021 — Sixth Amendment, 2026
Commencement notices and reasons
- Dated 20 Jan 2026MP Gazette Notification dated 23 January 2026
7 more documents belong here and are not on Voltaic: 7 copies in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.