Intra-State Open Access (Revision-I) Regulations, 2021 — Third Amendment, 2023

Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access in Madhya Pradesh)(Revision-I) Regulations, 2021 (Third Amendment) {ARG-24(I)(iii) of 2023}

AmendmentDated 26 Jul 2023No 1686/MPERC / 2023 dated 26th July 2023

Amends the Intra-State Open Access Regulations, 2021 (Revision-I).

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-page amendment by the Madhya Pradesh Electricity Regulatory Commission, issued at Bhopal on 26 July 2023 under file No 1686/MPERC/2023, to the MPERC (Terms and Conditions for Intra-State Open Access in Madhya Pradesh)(Revision-I) Regulations, 2021 — the "Principal Regulations" (p1). It is the Third Amendment to those regulations and carries its own reference, ARG-24(I)(iii) of 2023. It comes into force from the date of publication in the Madhya Pradesh Gazette, a date the document does not print, and extends to the whole of Madhya Pradesh (p1).

It makes two changes and nothing else. First, it substitutes the second proviso to Regulation 3.3 to restate who must be given open access: renewable energy generators and users with contracted demand or sanctioned load of 100 kilowatt or more — through a single connection, or through multiple connections aggregating 100 kilowatt or more in the same electricity division of a distribution licensee — subject to there being no operational constraints in the licensee's system (p1). Second, it substitutes the fifth proviso to clause 13B(ii) of Regulation 13, exempting from additional surcharge the green energy supplied to a Green Energy Open Access Consumer from offshore wind projects commissioned up to December 2032 (p1).

The document contains no definitions, forms, fees or transitional provisions; the previous text of both substituted provisos is not reproduced (p1).

Standard name
Open Access Regulations
Primary topics
Open access, Green energy open access, Open access charges

Read with this

The regulation

Commencement notices and reasons

7 more documents belong here and are not on Voltaic: 7 copies in another language.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗