MPERC · Madhya Pradesh Electricity Regulatory Commission

Madhya Pradesh Intra-State Open Access Regulations, 2021 — First Amendment, 2023

Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access in Madhya Pradesh) Regulations, (Revision-I) 2021 (First Amendment) {ARG-24(I)(i) of 2023}

AmendmentDated 16 Jan 2023No. MPERC/2023/161 dated 16th January 2023

Amends the Intra-State Open Access Regulations, 2021 (Revision-I).

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the First Amendment to the MPERC (Terms and Conditions for Intra-State Open Access in Madhya Pradesh) (Revision-I) Regulations, 2021, issued from Bhopal on 16 January 2023 (p1). It is a compact amending instrument of nine paragraphs that grafts a Green Energy Open Access regime onto the 2021 Principal Regulations. It extends to the whole of Madhya Pradesh and comes into force from the date of publication in the MP Gazette — the Gazette date is not printed (p1).

The amendment first inserts a definition of 'Green Energy' in Regulation 2 (p1), then reworks Regulation 3.3 so that renewable generators and users of 100 KW or above are given open access subject to system constraints, while preserving the permissions of existing sub-100 KW renewable open access holders and freezing a green energy consumer's draw for at least twelve time blocks (p1–2). Regulations 5.1 and 6.1 are changed to bring green energy consumers within the classification of open access customers and to give non-fossil-fuel sources priority over fossil-fuel open access (p2).

The bulk of the instrument is new procedure and charging architecture. New Regulation 8.1.1 names the nodal agencies — the SLDC for short-term and the STU for medium- and long-term green energy open access — with applications routed through the Central Nodal Agency's portal (p2). New Regulation 8.5.1 lays down the grant procedure: fifteen-day deemed approval, first-in-first-out processing, a spare-capacity test for short/medium-term against possible augmentation for long-term, a hearing before any refusal, speaking orders, and appeals to the Commission within 30 days to be disposed of within three months (p3). The processing time schedule in Regulation 9 and the dispute-resolution heading in Regulation 8.8 are expressly confined to consumers other than green energy open access consumers (p3–4).

New Regulation 13B then lists the charges leviable on green energy open access consumers, the exemptions, caps and conditional reliefs on cross-subsidy, additional and standby charges, and the special treatment of waste-to-energy and of green hydrogen/ammonia production (p4–5).

Standard name
Open Access Regulations, Green Energy Open Access Regulations
Primary topics
Green energy open access, Open access, Open access charges

Read with this

The regulation

Commencement notices and reasons

7 more documents belong here and are not on Voltaic: 7 copies in another language.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document