MPERC · Madhya Pradesh Electricity Regulatory Commission
Madhya Pradesh Intra-State Open Access Regulations, 2021 — First Amendment, 2023
Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access in Madhya Pradesh) Regulations, (Revision-I) 2021 (First Amendment) {ARG-24(I)(i) of 2023}
AmendmentDated 16 Jan 2023No. MPERC/2023/161 dated 16th January 2023
Amends the Intra-State Open Access Regulations, 2021 (Revision-I).
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the First Amendment to the MPERC (Terms and Conditions for Intra-State Open Access in Madhya Pradesh) (Revision-I) Regulations, 2021, issued from Bhopal on 16 January 2023 (p1). It is a compact amending instrument of nine paragraphs that grafts a Green Energy Open Access regime onto the 2021 Principal Regulations. It extends to the whole of Madhya Pradesh and comes into force from the date of publication in the MP Gazette — the Gazette date is not printed (p1).
The amendment first inserts a definition of 'Green Energy' in Regulation 2 (p1), then reworks Regulation 3.3 so that renewable generators and users of 100 KW or above are given open access subject to system constraints, while preserving the permissions of existing sub-100 KW renewable open access holders and freezing a green energy consumer's draw for at least twelve time blocks (p1–2). Regulations 5.1 and 6.1 are changed to bring green energy consumers within the classification of open access customers and to give non-fossil-fuel sources priority over fossil-fuel open access (p2).
The bulk of the instrument is new procedure and charging architecture. New Regulation 8.1.1 names the nodal agencies — the SLDC for short-term and the STU for medium- and long-term green energy open access — with applications routed through the Central Nodal Agency's portal (p2). New Regulation 8.5.1 lays down the grant procedure: fifteen-day deemed approval, first-in-first-out processing, a spare-capacity test for short/medium-term against possible augmentation for long-term, a hearing before any refusal, speaking orders, and appeals to the Commission within 30 days to be disposed of within three months (p3). The processing time schedule in Regulation 9 and the dispute-resolution heading in Regulation 8.8 are expressly confined to consumers other than green energy open access consumers (p3–4).
New Regulation 13B then lists the charges leviable on green energy open access consumers, the exemptions, caps and conditional reliefs on cross-subsidy, additional and standby charges, and the special treatment of waste-to-energy and of green hydrogen/ammonia production (p4–5).
Read with this
The regulation
- Dated 14 Dec 2021Intra-State Open Access Regulations, 2021 (Revision-I)
Amendments and corrections
- Dated 5 Apr 2023Intra-State Open Access Regulations, 2021 — Second Amendment, 2023
- Dated 26 Jul 2023Intra-State Open Access (Revision-I) Regulations, 2021 — Third Amendment, 2023
- Dated 24 May 2024Intra-State Open Access Regulations, 2021 — Fourth Amendment, 2024
- Dated 4 Mar 2025Intra-State Open Access Regulations, 2021 (Revision-I) — Fifth Amendment, 2025
- Dated 7 Mar 2025MP Gazette Notification dated 07-MARCH-2025
- Dated 20 Jan 2026Intra-State Open Access Regulations, 2021 — Sixth Amendment, 2026
Commencement notices and reasons
- Dated 20 Jan 2026MP Gazette Notification dated 23 January 2026
7 more documents belong here and are not on Voltaic: 7 copies in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.