Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Intra-State Open Access Regulations, 2021 — Sixth Amendment, 2026

Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access in Madhya Pradesh) Regulations, (Revision-I) 2021 (Sixth Amendment) {ARG-24(I)(vi) of 2026}

AmendmentDated 20 Jan 2026Published in the Gazette 23 Jan 2026No. 125/MPERC/2026 dated 20/01/2026

Amends the Intra-State Open Access Regulations, 2021 (Revision-I).

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Sixth Amendment by MPERC to the Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access in Madhya Pradesh) (Revision-I) Regulations, 2021 — referred to in the text as the 'Principal Regulations'. The notification is dated 20 January 2026 with a Gazette notification date of 23 January 2026 (p1), and it takes effect from Gazette publication (p1).

It does only one substantive thing: it substitutes Regulation 13.2 of the Principal Regulations (p1). The replacement text requires every consumer with contract demand who is eligible for open access to state, at the time of application, whether the open access is sought (i) up to contract demand, (ii) over and above contract demand, or (iii) a combination of both — and extends the same option to existing open access customers (p1–2). The provisos then fix how the two categories are treated: open access up to contract demand carries adjustment of open access energy only (no adjustment of open access demand in billing demand), while all injecting customers must make reasonable endeavours to keep actual sent-out capacity within the stated sent-out capacity (p2). Balancing and settlement at entry and exit points must follow the MP Electricity Balancing and Settlement Code, 2023, the MPERC Wind and Solar Forecasting, Scheduling and DSM Regulations, 2018 and the MP Electricity Grid Code, 2024 as applicable from time to time, and distribution licensees must report 15-minute-block renewable energy credited to open access consumers to MP SLDC weekly and by the 3rd of each month (p2).

Annexure-II (pp3–5) restates the same scheme as three worked cases — open access within contract demand, wholly over and above it, and split between the two — covering technical feasibility, meter requirements, 15-minute-block energy and demand segregation, additional surcharge and residual billing by the distribution licensee. The examples are illustrative only; the operative obligation sits in the substituted Regulation 13.2.

Standard name
Open Access Regulations
Primary topics
Open access, Energy accounting and settlement, Open access charges

Read with this

The regulation

Commencement notices and reasons

7 more documents belong here and are not on Voltaic: 7 copies in another language.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document