MPERC · Madhya Pradesh Electricity Regulatory Commission
Intra-State Open Access Regulations, 2021 — Sixth Amendment, 2026
Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access in Madhya Pradesh) Regulations, (Revision-I) 2021 (Sixth Amendment) {ARG-24(I)(vi) of 2026}
AmendmentDated 20 Jan 2026Published in the Gazette 23 Jan 2026No. 125/MPERC/2026 dated 20/01/2026
Amends the Intra-State Open Access Regulations, 2021 (Revision-I).
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Sixth Amendment by MPERC to the Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access in Madhya Pradesh) (Revision-I) Regulations, 2021 — referred to in the text as the 'Principal Regulations'. The notification is dated 20 January 2026 with a Gazette notification date of 23 January 2026 (p1), and it takes effect from Gazette publication (p1).
It does only one substantive thing: it substitutes Regulation 13.2 of the Principal Regulations (p1). The replacement text requires every consumer with contract demand who is eligible for open access to state, at the time of application, whether the open access is sought (i) up to contract demand, (ii) over and above contract demand, or (iii) a combination of both — and extends the same option to existing open access customers (p1–2). The provisos then fix how the two categories are treated: open access up to contract demand carries adjustment of open access energy only (no adjustment of open access demand in billing demand), while all injecting customers must make reasonable endeavours to keep actual sent-out capacity within the stated sent-out capacity (p2). Balancing and settlement at entry and exit points must follow the MP Electricity Balancing and Settlement Code, 2023, the MPERC Wind and Solar Forecasting, Scheduling and DSM Regulations, 2018 and the MP Electricity Grid Code, 2024 as applicable from time to time, and distribution licensees must report 15-minute-block renewable energy credited to open access consumers to MP SLDC weekly and by the 3rd of each month (p2).
Annexure-II (pp3–5) restates the same scheme as three worked cases — open access within contract demand, wholly over and above it, and split between the two — covering technical feasibility, meter requirements, 15-minute-block energy and demand segregation, additional surcharge and residual billing by the distribution licensee. The examples are illustrative only; the operative obligation sits in the substituted Regulation 13.2.
Read with this
The regulation
- Dated 14 Dec 2021Intra-State Open Access Regulations, 2021 (Revision-I)
Amendments and corrections
- Dated 16 Jan 2023Madhya Pradesh Intra-State Open Access Regulations, 2021 — First Amendment, 2023
- Dated 5 Apr 2023Intra-State Open Access Regulations, 2021 — Second Amendment, 2023
- Dated 26 Jul 2023Intra-State Open Access (Revision-I) Regulations, 2021 — Third Amendment, 2023
- Dated 24 May 2024Intra-State Open Access Regulations, 2021 — Fourth Amendment, 2024
- Dated 4 Mar 2025Intra-State Open Access Regulations, 2021 (Revision-I) — Fifth Amendment, 2025
- Dated 7 Mar 2025MP Gazette Notification dated 07-MARCH-2025
Commencement notices and reasons
- Dated 20 Jan 2026MP Gazette Notification dated 23 January 2026
7 more documents belong here and are not on Voltaic: 7 copies in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.