MPERC · Madhya Pradesh Electricity Regulatory Commission
Intra-State Open Access Regulations, 2021 (Revision-I)
Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access in Madhya Pradesh) Regulations, 2021 (Revision-I) {RG-24(I) of 2021}
RegulationDated 14 Dec 2021No1961/MPERC/2021 dated 14th December 2021
7 amendments to it are on Voltaic, the latest dated 20 Jan 2026.
Summary
Summary written by software, from pages 1 to 27 of 46. Check the regulator's original before you rely on it.
The Commission issues the 2021 Revision-I of the MPERC intra-State open access regulations, replacing the 2005 framework. The operative text (pp1–24) begins with commencement and scope (p1), definitions (pp1–3), eligibility and conditions (pp3–4), treatment of existing licensees/customers (pp4–5), customer categories by duration (p5), allotment priority (pp5–6), and technical criteria for transmission and distribution access (p6).
Chapter 8 (pp6–11) is the procedural core: it designates the STU for long-term and medium-term access and the SLDC for short-term access as nodal agencies; sets application, system-study, short-term reservation and bidding processes; and creates an Open Access Monitoring, Dispute Resolution and Decision Review Committee. Chapters 9–12 (pp12–15) specify processing timelines, day-ahead/same-day scheduling, agreements (BPTA/BPWA), relinquishment and under-utilisation consequences, and curtailment order.
Chapters 13–18 (pp15–21) cover charges principles (transmission, wheeling, operating, imbalance, reactive, cross-subsidy, additional, interconnection), energy losses, priority for energy-credit adjustment, billing/security/payment, metering, and point-of-injection/drawal flexibility. Chapters 19–22 (pp21–24) cover information disclosure, SLDC infrastructure, grievance redressal, difficulty removal, amendment and repeal/savings. Annexure-1 (pp25–27, continuing) tabulates, by connection/location and access type, nodal agency, fees, documents, disposal timelines, charges and losses. It applies to open access customers of 1 MW and above using intra-State transmission or distribution systems, with carve-outs for captive, renewable and net-metered premises.
Read with this
Amendments and corrections
- Dated 16 Jan 2023Madhya Pradesh Intra-State Open Access Regulations, 2021 — First Amendment, 2023
- Dated 5 Apr 2023Intra-State Open Access Regulations, 2021 — Second Amendment, 2023
- Dated 26 Jul 2023Intra-State Open Access (Revision-I) Regulations, 2021 — Third Amendment, 2023
- Dated 24 May 2024Intra-State Open Access Regulations, 2021 — Fourth Amendment, 2024
- Dated 4 Mar 2025Intra-State Open Access Regulations, 2021 (Revision-I) — Fifth Amendment, 2025
- Dated 7 Mar 2025MP Gazette Notification dated 07-MARCH-2025
- Dated 20 Jan 2026Intra-State Open Access Regulations, 2021 — Sixth Amendment, 2026
Commencement notices and reasons
- Dated 20 Jan 2026MP Gazette Notification dated 23 January 2026
7 more documents belong here and are not on Voltaic: 7 copies in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.