MPERC · Madhya Pradesh Electricity Regulatory Commission
MP Gazette Notification dated 07-MARCH-2025
MP Gazette Notification dated 07-MARCH-2025 (English)
AmendmentDated 7 Mar 2025Published in the Gazette 7 Mar 2025MPERC/2025/424
Amends the Intra-State Open Access Regulations, 2021 (Revision-I).
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is one page of an MPERC notification (No. MPERC/2025/424) that amends the Commission's 2021 (Revision-I) regulations on two subjects at the same time: terms and conditions for intra-State open access, and cogeneration and generation of electricity from renewable sources of energy (p1). The words 'Fifth' and '(Revision-I)' appear against both, suggesting a fifth round of amendments to each. The notification states its power as s.42(3) and s.86(1)(e) read with s.181(1) of the Electricity Act (p1).
The operative amendment clauses, any substituted provisions, the issue date and the Gazette reference are not legibly readable, so nothing can be said about what exactly changes in either regulation.
Read with this
The regulation
- Dated 14 Dec 2021Intra-State Open Access Regulations, 2021 (Revision-I)
Amendments and corrections
- Dated 16 Jan 2023Madhya Pradesh Intra-State Open Access Regulations, 2021 — First Amendment, 2023
- Dated 5 Apr 2023Intra-State Open Access Regulations, 2021 — Second Amendment, 2023
- Dated 26 Jul 2023Intra-State Open Access (Revision-I) Regulations, 2021 — Third Amendment, 2023
- Dated 24 May 2024Intra-State Open Access Regulations, 2021 — Fourth Amendment, 2024
- Dated 4 Mar 2025Intra-State Open Access Regulations, 2021 (Revision-I) — Fifth Amendment, 2025
- Dated 20 Jan 2026Intra-State Open Access Regulations, 2021 — Sixth Amendment, 2026
Commencement notices and reasons
- Dated 20 Jan 2026MP Gazette Notification dated 23 January 2026
7 more documents belong here and are not on Voltaic: 7 copies in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.