MP Gazette Notification dated 23 January 2026

MP Gazette Notification dated 23-JAN-2026

GazetteDated 20 Jan 2026

Read with the Intra-State Open Access Regulations, 2021 (Revision-I).

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Sixth Amendment to the MPERC (Terms and Conditions for Intra-State Open Access in Madhya Pradesh) (Revision-I) Regulations, 2021, issued at Bhopal on 20 January 2026 as No. 125/MPERC/2026 and taking effect from the date of publication in the Madhya Pradesh Gazette (p8). It substitutes Regulation 13.2 of the Principal Regulations.

The new Regulation 13.2 requires every consumer with a contract demand with the distribution licensee who is eligible for open access to state, at the time of application, whether open access is wanted (i) up to contract demand, (ii) over and above contract demand, or (iii) a combination of both; existing open access customers may also apply on that basis (p8–9). The provisos distinguish the treatment of the two limbs: where open access is up to contract demand, only open access energy is adjusted in the billing meter's recorded energy and no demand adjustment is made; licensees must follow the MP Electricity Balancing and Settlement Code 2023, the 2018 Forecasting/Scheduling/DSM Regulations for wind and solar, and the MP Electricity Grid Code 2024; and distribution licensees must report 15-minute-block energy credited to consumers for intra-State renewables to MP SLDC weekly and monthly by the 3rd (p9).

Annexure-II (pp10–12) supplies worked illustrations of the three configurations — within contract demand, over and above it, and a mix — setting out when technical feasibility at the drawl end is needed, the ABT metering requirement, the 15-minute-block energy and demand segregation and its priority order, and when additional surcharge applies (not on energy within contract demand; not on captive plants).

Read with this

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document