Explanatory Memorandum on Draft Multi Year Tariff (First Amendment) Regulations, 2022

EXPLANATORY MEMORANDUM ON Draft Maharashtra Electricity Regulatory Commission (Multi Year Tariff) (First Amendment) Regulations, 2022

Explanatory memorandum to a draftReleased with the notice dated 19 Aug 2022

Draft

The draft has since been finalised as the Multi Year Tariff Regulations, 2019 — First Amendment, 2023.

Explanatory memorandum to the Multi Year Tariff (First Amendment) Regulations, 2022 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is MERC's explanatory memorandum, dated August 2022, accompanying a draft first amendment to its Multi Year Tariff Regulations that would create a threshold for compulsory tariff-based competitive bidding (TBCB) of new intra-state transmission projects (p1, p33).

Chapter 1 sets out the statutory and policy background: Section 63 of the Electricity Act 2003, the National Electricity Policy and Tariff Policy 2016, the Ministry of Power's TBCB guidelines, and MERC's earlier order saying it would separately decide a threshold (pp7–11). Chapter 2 explains when regulated tariff/cost-plus can still be used, reviews inter-state TBCB versus RTM experience, and cautions that TBCB does not always produce lower tariffs (pp12–15). Chapter 3 surveys threshold limits adopted by other SERCs and TBCB developments in Maharashtra, including the Empowered Committee (pp16–21). Chapter 4 draws qualitative lessons from the United Kingdom, Brazil and Peru (pp22–27). Chapter 5 sets out the method — the cost distribution of past and ongoing schemes plus scenario analysis — and proposes a threshold of Rupees Two Hundred (200) Crore for new transmission projects, with conditions on scope, strategic exceptions and the STU's role (pp27–32). Chapter 6 contains the draft amendment: new Regulation 56.3 and Annexure IV, including the threshold and exceptions, and invites stakeholder comments (pp33–34).

Standard name
Multi Year Tariff Regulations
Primary topics
Competitive bidding, Transmission tariff

Read with this

The regulation

Amendments and corrections

Earlier drafts

7 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 3 drafts or notices on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.