MERC · Maharashtra Electricity Regulatory Commission
Multi Year Tariff Regulations, 2019 — First Amendment, 2023
Maharashtra Electricity Regulatory Commission (Multi Year Tariff) (First Amendment) Regulations, 2023
AmendmentDated 10 Feb 2023No. MERC/Tech/Regulation- dated 10February , 2023
Replaced by Multi Year Tariff Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Multi Year Tariff Regulations, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Maharashtra Electricity Regulatory Commission (Multi Year Tariff) (First Amendment) Regulations, 2023 amend the MERC (Multi Year Tariff) Regulations, 2019 to route new intra-State transmission projects above a defined size through tariff-based competitive bidding rather than cost-plus tariff determination (p1–2).
The preamble (p1) recites the Commission's tariff jurisdiction under Section 86 of the Electricity Act and the option to adopt a bid-discovered tariff under Section 63, and points to Clause 5.3 of the Tariff Policy, 2016, which requires intra-State transmission to be bid out above a threshold to be fixed by the State Commission. The amendment's stated purpose is to specify that threshold and the accompanying conditions (p1).
The operative changes are three. Regulation 56.1 is substituted so that the Part on transmission tariffs applies to access and use of the intra-State transmission system under a Bulk Power Transmission Agreement or other arrangement not covered by the new bidding route, with a proviso requiring the Commission to redetermine tariff for the remaining years of the Control Period when a new transmission licensee's system is added (p2). A new Regulation 56.3 requires all new intra-State transmission systems above the threshold and meeting Annexure-IV conditions to be developed through Tariff Based Competitive Bidding under the Central Government's Section 63 guidelines (p2). Annexure IV is added, fixing a Threshold Limit of Rupees Five Hundred (500) Crore excluding land cost, and setting out which projects are in scope, the exclusions, the single-project rule and the prior-approval route for cost-plus exceptions (p2–3).
Commencement is from the date of publication in the Official Gazette (p1); the notification is signed and dated 10 February 2023 (p3). It binds the State Transmission Utility and transmission licensees in Maharashtra.
Read with this
The regulation
- Date not statedMulti Year Tariff Regulations, 2019
Amendments and corrections
- Date not statedMulti Year Tariff (Second Amendment) Regulations, 2023
Commencement notices and reasons
Earlier drafts
- Released with the notice dated 28 May 2019Draft Multi Year Tariff Regulations, 2019
- Released with the notice dated 28 May 2019Explanatory memorandum: Draft Multi Year Tariff Regulations, 2019 — Explanatory Memorandum
- Dated 28 May 2019Public notice: Draft Multi Year Tariff Regulations, 2019 — Public Notice Inviting Comments
- Dated 19 Aug 2022Multi Year Tariff (First Amendment) Regulations, 2022 — Draft
- Released with the notice dated 19 Aug 2022Explanatory memorandum: Explanatory Memorandum on Draft Multi Year Tariff (First Amendment) Regulations, 2022
- Dated 19 Aug 2022Public notice: Public Notice Inviting Comments on Draft Multi Year Tariff (First Amendment) Regulations, 2022
7 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 3 drafts or notices on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.