Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Draft Multi Year Tariff Regulations, 2019

Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019

Draft regulationReleased with the notice dated 28 May 2019

Draft

A proposal that has since been finalised as the Multi Year Tariff Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The draft Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019 set out the framework MERC proposes to use to determine aggregate revenue requirements, tariffs and MSLDC fees and charges for the five-year Control Period from 1 April 2020 to 31 March 2025. They extend to the whole State of Maharashtra and, once notified, apply to existing and future Generating Companies, Transmission Licensees, Distribution Licensees and MSLDC and their successors (p6). They are to come into force on publication in the Official Gazette and supersede the 2015 MYT Regulations, while review and tariff matters up to 31 March 2020 continue under the 2005, 2011 or 2015 Regulations, as applicable (p6).

Regulations 1–3 and the definitions (p6–23) establish scope: generation supply to Distribution Licensees other than from renewable sources, intra-State transmission, wheeling, retail supply, MSLDC fees and charges, cross-subsidy surcharge and additional surcharge. Tariffs determined through Section 63 competitive bidding are to be adopted rather than re-determined (p23).

Part A (p24–36) creates the MYT architecture: a five-year forecast and tariff determination, a Mid-Term Review, true-up, filing calendars, and the distinction between controllable and uncontrollable factors. It provides for monthly pass-through of fuel, power purchase and inter-State transmission cost variations through the ZFAC and yearly treatment of other uncontrollable costs through ZOUC, plus a sharing mechanism for controllable gains and losses.

Part B (p36–41) prescribes the petition and tariff-determination procedure, including technical validation, public notice and publication requirements, the tariff order timeline and adherence to the tariff order, and the ability of Generating Companies and Transmission Licensees to charge below ceiling tariffs by agreement with beneficiaries. Part C (p41–46) requires a Commission-approved power procurement plan covering long-term, medium-term and short-term procurement, prior approval of long-term and medium-term PPAs, and limited routes for additional, cheaper or emergency procurement.

Part D (p46–75) lays down financial principles: prudence checks, capital cost and capital structure, additional capitalisation, consumer contributions and grants, debt-equity ratio, depreciation, return on equity, interest on loan and working capital, foreign exchange variation, carrying cost, income tax, contingency reserves, rebates, incentives, penalties and delayed payment charges.

Parts E to I (p75–144) contain the sector-specific tariff construction. Part E covers conventional generation and hydro: tariff components, annual fixed charges, renovation and modernisation, infirm power, non-tariff income, thermal and hydro operational norms and O&M, capacity and energy charges, pumped storage, declared-capacity demonstration and deviation charges. Part F covers transmission: ARR components, provisional tariff, capital investment plan, availability norms, O&M norms, non-tariff income, TTSC pooling and sharing, transmission losses and reactive energy charges. Part G covers the Distribution Wires Business: account separation and allocation, wheeling ARR, capital investment, O&M, bad debts, non-tariff income and wheeling losses. Part H covers retail supply: ARR, sales forecast, capital investment, O&M, bad debts, non-tariff income, cross-subsidy and additional surcharge receipts, distribution losses and retail tariff principles. Part I covers MSLDC fees and charges, its capital investment plan, LDC Development Fund, O&M, RLDC and WRPC charges, sharing of MSLDC charges, fees and billing.

Part J (p144–145) specifies how State Government subsidies are to be paid and shown in consumer bills. Part K (p145) gives the Commission powers to issue practice directions, amend the regulations and remove difficulties. Annexure I (p146–149) sets the straight-line depreciation schedule. Annexure II (p150–155) gives the procedure and formulae for computing monthly transmission system availability, including element definitions and SIL values. Annexure III is listed as the MTBF computation annexure (p5, p156).

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, ARR and true-up

Read with this

The regulation

Amendments and corrections

Earlier drafts

7 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 3 drafts or notices on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document