MERC · Maharashtra Electricity Regulatory Commission
Multi Year Tariff (First Amendment) Regulations, 2023 — Statement of Reasons
MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (MULTI YEAR TARIFF) (FIRST AMENDMENT) REGULATIONS, 2023
Statement of reasonsDated 10 Feb 2023
Replaced by Multi Year Tariff Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Multi Year Tariff Regulations, 2019 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is MERC's Statement of Reasons for the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) (First Amendment) Regulations, 2023, dated 10 February 2023 (p1). It explains why the Commission amended the MYT Regulations to set a threshold for tariff-based competitive bidding (TBCB) of intra-State transmission projects, and records the consultation and stakeholder comments on the draft amendment. The draft regulations and explanatory memorandum were published on 19 August 2022, with comments invited by 19 September 2022 (p1). The Commission also notes the Supreme Court's 23 November 2022 judgment in Civil Appeal No. 1933 of 2022, which directed SERCs to frame or amend tariff regulations under Section 181 and to be guided by Section 61 principles, including the National Electricity Policy and Tariff Policy (p2).
Chapter 1 (p4–7) deals with the threshold limit. Stakeholders proposed limits from Rs 100 crore to Rs 800 crore, with Mumbai-specific suggestions. The Commission rejected the draft Rs 200 crore and finally fixed the threshold at Rs 500 crore excluding land cost (p7). It explains that land is costlier in the Mumbai Metropolitan Region, that a separate MMR limit would be inappropriate, and that project costs have risen since the data on FY 2015-16 to FY 2021-22 projects. It says it will review the threshold when framing the next MYT Regulations, based on TBCB progress until FY2024-25 (p7).
Chapter 2 (p8–10) sets out exemptions. New intra-State transmission systems costing Rs 500 crore or more, excluding land cost, must go through TBCB, but schemes involving upgradation or augmentation of an existing transmission licensee's assets, and schemes already appearing in a transmission licensee's licence, are excluded. The threshold applies only to projects whose approval is still pending, with a carve-out for in-principle applications already under consideration. The Commission declined to exclude schemes merely because they were submitted to the STU or approved by MTC/GCC, saying that would leave little for TBCB (p9–10).
Chapter 3 (p11–12) covers packaging. Regulation 56.1 is amended to clarify its scope for non-TBCB intra-State transmission tariffs, with a proviso for redetermining tariffs when a new system is added during the control period. Upstream and downstream elements are to be designed as a single project for bidding, to avoid stranded elements and ensure a viable bid size (p11–12).
Chapter 4 (p13–15) covers projects that qualify for TBCB but need execution under Section 62. The STU may take such projects on a cost-plus route only with prior Commission approval, for critical projects or ownership/interface reasons; below-threshold projects may be bid with reasons and prior approval. Chapter 5 (p16) records other comments, including a suggestion on an independent engineer under the Transmission Service Agreement, which the Commission says will be governed by the standard bidding documents. Annexure I (p17) lists the eight stakeholders who commented.
Read with this
The regulation
- Date not statedMulti Year Tariff Regulations, 2019
Amendments and corrections
- Dated 10 Feb 2023Multi Year Tariff Regulations, 2019 — First Amendment, 2023
- Date not statedMulti Year Tariff (Second Amendment) Regulations, 2023
Commencement notices and reasons
Earlier drafts
- Released with the notice dated 28 May 2019Draft Multi Year Tariff Regulations, 2019
- Released with the notice dated 28 May 2019Explanatory memorandum: Draft Multi Year Tariff Regulations, 2019 — Explanatory Memorandum
- Dated 28 May 2019Public notice: Draft Multi Year Tariff Regulations, 2019 — Public Notice Inviting Comments
- Dated 19 Aug 2022Multi Year Tariff (First Amendment) Regulations, 2022 — Draft
- Released with the notice dated 19 Aug 2022Explanatory memorandum: Explanatory Memorandum on Draft Multi Year Tariff (First Amendment) Regulations, 2022
- Dated 19 Aug 2022Public notice: Public Notice Inviting Comments on Draft Multi Year Tariff (First Amendment) Regulations, 2022
7 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 3 drafts or notices on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.