MERC · Maharashtra Electricity Regulatory Commission

Multi Year Tariff (Second Amendment) Regulations, 2023

Maharashtra Electricity Regulatory Commission (Multi Year Tariff) (Second Amendment) Regulations, 2023

AmendmentDate not statedMERC/Tech/Regulation 0264

Replaced by Multi Year Tariff Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Multi Year Tariff Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software, from pages 1 to 34 of 43. Check the regulator's original before you rely on it.

These are the Maharashtra Electricity Regulatory Commission's Second Amendment Regulations, 2023, notified as No. MERC/Tech/Regulation 0264. MERC makes them under Sections 61 and 86(3) read with Section 181 of the Electricity Act, 2003 and in pursuance of Clause 5.3 of the Tariff Policy, 2016 (p1). They amend the MERC (Multi Year Tariff) Regulations, 2019 ('the Principal Regulations') and come into force from the date of publication in the Official Gazette. Their stated trigger is the First and Second Amendments by CERC to its 2019 Tariff Regulations (p1). New Regulation 1.3(A) makes the amendments applicable where a generating company supplies coal or lignite from an integrated mine to one or more specified end-use generating stations whose tariff MERC determines under Section 62 read with Section 86 (p1).

The document is mainly an integrated-mine and emission-control overlay on the MYT framework. It adds definitions — annual target quantity, emission-control auxiliary consumption (AUXe), integrated-mine commercial operation date, mine infrastructure, mining plan, peak rated capacity, base rate of delayed payment charge, and others (pp2–8). It carries emission-control systems into capital cost, depreciation, return on equity, interest on loan, foreign-exchange variation and working capital (pp9–12). Delayed-payment charge is recast and tied to the Late Payment Surcharge Rules, 2022, including instalment payment and payment-adjustment rules (pp12–13). Generating companies with integrated mines must file an input-price petition within 60 days of mine COD or notification, whichever is later (pp13–14).

Later clauses revise tariff structure (p14), prescribe emission-control auxiliary consumption and reagent norms (pp14–16), O&M and opex treatment (pp16–17), energy charge formulae with reagent and biomass co-firing (pp18–20), and the plant availability factor formula (pp20–21). The largest new part sets the methodology for determining input price of coal or lignite from integrated mines: ROM cost for auction, allotment and lignite routes, additional charges, capital and additional capital expenditure, annual extraction cost, capital structure, depreciation, O&M, working capital, mine closure, recovery and OB/GCV/NTI adjustments (pp21–34).

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Fuel price and supply, Emission control costs

Read with this

The regulation

Amendments and corrections

Earlier drafts

7 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 3 drafts or notices on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document