MERC · Maharashtra Electricity Regulatory Commission
Multi Year Tariff (First Amendment) Regulations, 2022 — Draft
Maharashtra Electricity Regulatory Commission (Multi Year Tariff) (First Amendment) Regulations, 2022
Draft amendmentDated 19 Aug 2022
Draft
A proposal that has since been finalised as the Multi Year Tariff Regulations, 2019 — First Amendment, 2023.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft MERC notification that amends the Commission's Multi Year Tariff Regulations, 2019 (the "Principal Regulations") to route new intra-State transmission capacity through tariff-based competitive bidding. The preamble (p1) sets out the reasoning: the Commission determines generation, supply, transmission and wheeling tariffs under Section 86, may choose between Sections 62 and 63 for intra-State transmission, and Clause 5.3 of the Tariff Policy, 2016 requires competitive bidding above a threshold limit that the State Commission itself must fix. The draft notes that the MERC (MYT) (First Amendment) Regulations, 2022 already fixed such a limit and prescribed conditions, and now seeks to write the rule into the Principal Regulations. It states it is issued after previous publication and takes effect from Gazette publication (p1–2).
The operative part adds Regulation 56.3 to the Principal Regulations: all new intra-State transmission systems above the threshold and meeting the Annexure-IV conditions are to be developed through tariff-based competitive bidding under the Central Government's Section 63 guidelines (p1).
The new Annexure IV (p2) fixes the threshold at Rupees Two Hundred (200) Crore and sets the surrounding rules: the STU must bid out projects at or above that cost; the limit applies to new projects still awaiting Commission approval, but excludes projects whose in-principle applications are already under consideration, and covers projects whose approval has lapsed or been cancelled; an entire independent transmission system, including upstream and downstream elements, must be bid as one project; and the STU may depart from the default route in either direction — cost-plus above the threshold, or bidding below it — only with prior Commission approval, for stated reasons such as critical projects (Defence, Railways, Airport) or ownership/interface problems.
Read with this
The regulation
- Date not statedMulti Year Tariff Regulations, 2019
Amendments and corrections
- Dated 10 Feb 2023Multi Year Tariff Regulations, 2019 — First Amendment, 2023
- Date not statedMulti Year Tariff (Second Amendment) Regulations, 2023
Commencement notices and reasons
Earlier drafts
- Released with the notice dated 28 May 2019Draft Multi Year Tariff Regulations, 2019
- Released with the notice dated 28 May 2019Explanatory memorandum: Draft Multi Year Tariff Regulations, 2019 — Explanatory Memorandum
- Dated 28 May 2019Public notice: Draft Multi Year Tariff Regulations, 2019 — Public Notice Inviting Comments
- Released with the notice dated 19 Aug 2022Explanatory memorandum: Explanatory Memorandum on Draft Multi Year Tariff (First Amendment) Regulations, 2022
- Dated 19 Aug 2022Public notice: Public Notice Inviting Comments on Draft Multi Year Tariff (First Amendment) Regulations, 2022
7 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 3 drafts or notices on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.