Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Multi Year Tariff Regulations, 2019 — Second Amendment — Statement of Reasons

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (MULTI YEAR TARIFF) REGULATIONS, 2019 (SECOND AMENDMENT) STATEMENT OF REASONS

Statement of reasonsDated 8 Jun 2023

Replaced by Multi Year Tariff Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Multi Year Tariff Regulations, 2019 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software, from pages 1 to 32 of 60. Check the regulator's original before you rely on it.

This is MERC's Statement of Reasons (SOR) for the MERC (Multi Year Tariff) Regulations, 2019 (Second Amendment), dated 8 June 2023. It explains why the Commission finalised the draft Second Amendment Regulations after public consultation; it is not itself the operative tariff order. The introduction (pp1–3) recalls the MYT Regulations 2019 for the 4th Control Period (1 April 2020–31 March 2025), the First Amendment of 10 February 2023 on TBCB thresholds, publication of the draft Second Amendment and Explanatory Memorandum on 29 October 2022, the comment process ending 5 December 2022, and the seven stakeholders whose submissions are listed at Annexure I. It also warns that comments outside the draft's scope are summarised but not individually ruled on (p2).

Chapter 1 (pp4–7) deals with the STU petition for removal of difficulties in implementing the MYT Regulations. It explains the proposed substitution of Regulation 66 on sharing intra-State transmission charges among TSUs, aligning it with the Commission's 18 October 2020 order in Case No. 52 of 2020 and applying from 1 April 2020 on a 15-minute block basis (pp4–7).

Chapter 2 (pp8–22) covers amendments linked to the MERC (Approval of Capital Investment Schemes) Regulations, 2022. It sets out proposals and rulings on capitalisation against non-DPR schemes; depreciation of capital investment schemes; return on equity on additional capitalisation and emission control systems; disallowance of DPR-based capitalisation; interest on loan for ECS; foreign exchange rate variation; treatment of schemes under O&M rather than capex; sharing of O&M efficiency gains; O&M norms for wires and retail supply; and recovery of road reinstatement charges, including an illustration and revised provisos (pp8–22). The Commission states the DPR-capitalisation clause operates prospectively for future investments (p13).

Chapter 3 (pp23–32, continuing) aligns amendments with the CERC Tariff Regulations, 2019-24. It covers definitions of capital cost and commercial operation date for ECS; depreciation for ECS; working capital for ECS; pass-through of ECS costs; normative auxiliary energy consumption and reagent consumption norms for emission-control technologies; water charges; and O&M expenses for ECS (pp23–32). It clarifies that ECS costs are recovered through generation tariff, not a separate charge (pp26–27, 27).

The pages end mid-Chapter 3. The contents list (p3) indicates later chapters on MoP's biomass co-firing policy (Chapter 4), the Electricity (Late Payment Surcharge and Related Matters) Rules, 2022 (Chapter 5), and additional points (Chapter 6); annexures mentioned include Annexure I (stakeholders, p2) and Annexure II (life-cycle cost format, p19).

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, Capital cost and investment

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Earlier drafts

7 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 3 drafts or notices on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document