Draft Multi Year Tariff Regulations, 2019 — Explanatory Memorandum

EXPLANATORY MEMORANDUM ON DRAFT MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (MULTI YEAR TARIFF) REGULATIONS, 2019

Explanatory memorandum to a draftReleased with the notice dated 28 May 2019

Draft

The draft has since been finalised as the Multi Year Tariff Regulations, 2019.

Explanatory memorandum to the draft Multi Year Tariff Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is MERC's May 2019 explanatory memorandum to the draft Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019 (p1). It is not the draft regulation itself: it explains why the Commission proposes to change selected clauses of the MYT Regulations, 2015 and reproduces proposed clauses for illustration (p12–13). The proposed framework is for the fourth Control Period, with applicability from 1 April 2020 and a five-year Control Period to 31 March 2025 (p16, p21).

The opening chapter sets out the statutory background under the Electricity Act, 2003, the guidance drawn from CERC Tariff Regulations, 2019, the National Electricity Policy and Tariff Policy, and the history of MERC's earlier MYT regulations and amendments (p9–13). Chapter 2 sets out the general principles: objectives, when the Commission prefers prescribing norms rather than principles, revised definitions, the Control Period, the MYT petition and mid-term review cycle, filing timelines, the classification of controllable and uncontrollable factors, the ZFAC/ZOUC pass-through architecture, and the proposed option for generators and transmission licensees to charge below ceiling tariffs (p14–33).

Chapter 3 deals with financial principles — financial prudence, capital cost and additional capitalisation, debt-equity, depreciation, return on equity and performance-linked additions or penalties, interest on loan and working capital, interest on security deposits, carrying cost, income tax, contingency reserves, rebates and penalties, and delayed payment charges (p34–65). Chapter 4 applies these to generation: common issues for thermal and hydel stations, the proposed shift to scheduled energy under the DSM regime, deviation charges, infirm power, operational norms for thermal stations, O&M expenses, and the computation of capacity and energy charges; it then covers hydel availability, auxiliary consumption, O&M and capacity/energy/lease-rent mechanics (p66–112).

Chapter 5 covers intra-State transmission: applicability, ARR components, provisional tariff, the postage-stamp transmission pricing framework, operational availability and incentives, O&M norms based on bays and circuit-kilometres, and transmission losses (p113–138). Chapter 6 covers the distribution wires business: ARR components, separation of wires and supply accounts, voltage-wise wheeling charges, O&M principles and bad-debt provisioning (p139–146). Chapter 7 covers retail supply: ARR, power procurement, approval of PPAs, procurement planning, additional procurement, O&M principles and bad debts (p147–154). Chapter 8 covers MSLDC annual fixed charges and O&M expenses (p155–159). The memorandum expressly says that only clauses where changes are proposed are discussed; unchanged clauses are not covered (p12).

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, ARR and true-up

Read with this

The regulation

Amendments and corrections

Earlier drafts

7 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 3 drafts or notices on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.