Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2026

Draft regulationReleased with the explanatory memorandum dated 22 Sep 2026

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is a draft principal regulation of the Maharashtra Electricity Regulatory Commission: the MERC (Distribution Open Access) Regulations, 2026. It is made under the Electricity Act, 2003 to replace the 2016 Distribution Open Access Regulations and to govern connectivity to, and use of, distribution systems in Maharashtra, including cases where a distribution licensee's network is not used but an open access consumer is supplied within its area (p1, p53). It applies to distribution licensees, generators and renewable generating stations with or without storage, standalone storage, captive plants, trading licensees, power exchanges and eligible consumers. It is to come into force on publication in the Official Gazette, but the notification number and the day of the September 2026 date are blank (p1, p54); pending applications are to be processed under existing regulations, with approvals subjected to the new regulations once notified (p1).

Part A (pp1–6) sets title, extent, commencement and definitions. The definitions establish the vocabulary for banking, banking slots, contracted RE capacity, energy storage, lead generator/lead ESS, full and partial open access consumers, solar-hour and non-solar-hour access, and green hydrogen/ammonia.

Part B (pp6–17) is the core eligibility and connectivity gate. Regulation 3 specifies who may seek connectivity — generating stations, REGS with or without ESS, captive plants, standalone ESS, including aggregation — the application route and fee, system studies, connection agreement, infirm power and decision timelines. It also imposes storage obligations on variable renewable connectivity, with exemptions and transition rules (p7). Regulation 4 sets eligibility to seek open access for generators, licensees and consumers, distinguishing renewable/green open access from non-RE open access, and sets demand-maintenance and penalty rules for non-RE consumers (pp13–14). Regulation 5 covers application formats, contract-demand revision, completion of works, meter reading and settlement of dues (pp15–17).

Part C (pp17–30) governs processing. It covers categories and duration of LTOA and STOA, the nodal agency, online application handling, interstate open access, documents, LTOA procedure and bank guarantee, STOA procedure and standing clearance, SOAR, consent from STU/SLDC/distribution licensee, allotment priority and allocation of distribution corridor. Several procedural timelines and deemed-consent rules sit here (pp21–29).

Part D (pp30–38) deals with charges. It specifies billing heads (wheeling, cross-subsidy, additional surcharge, banking/standby, MSLDC fees), exemptions for storage drawing solely for intermediate storage, transmission charges, wheeling charge principles, the treatment of cross-subsidy and additional surcharge, additional security, and the priority order for adjusting an open access consumer's drawal from different sources. The wheeling/loss tables and illustrations are marked as based on tariff orders/MYT orders (pp33–35).

Part E (pp38–41) covers scheduling, metering and communication, and transmission/distribution losses in kind. It distinguishes interstate and intra-state scheduling and requires special energy meters or smart meters for smaller green open access consumers.

Part F (pp41–46) covers deviation settlement, banking of renewable energy and reactive energy. It links banking to contracted RE capacity, defines banking slots and fixed/variable banking and standby charges, sets a transition to finer scheduling for large RE portfolios, and provides for lapsed banked energy and RECs (pp43–46).

Part G (pp46–48) sets billing, collection and disbursement for interstate and intra-state transactions, late payment surcharge, default and disconnection, payment security through letter of credit, and change of source.

Part H (p48) requires the nodal agency/distribution licensee to publish application forms, agreements, charges and open access status on its website.

Part I (pp49–54) requires detailed procedures and formats, addresses transmission-licensee obligations, curtailment priority, existing contracts, an open access monitoring committee, disputes, force majeure, exemptions for local authorities and changeover consumers, orders/practice directions, amendment, removal of difficulties, repeal and savings, and relaxation. It repeals the 2016 regulations while saving existing contracts and pending applications (pp53–54).

The annexures (pp55–89) provide the application form for connectivity, the connection agreement, STOA acknowledgement/payment schedule, LTOA application and agreement formats, standing-clearance format, and STOA application/grant formats.

Standard name
Open Access Regulations
Primary topics
Open access, Connectivity and GNA, Open access charges

Read with this

The regulation

Other copies of these documents (1)

Earlier drafts

5 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft, 2 drafts or notices on a draft not held as English text and 1 copy in another language.

Voltaic last read MERC's website for final documents on 28 Nov 2026 (8 pages) and for drafts on 28 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document