MERC · Maharashtra Electricity Regulatory Commission
Distribution Open Access (Second Amendment) Regulations, 2023 — Draft
Maharashtra Electricity Regulatory Commission (Distribution Open Access) (Second Amendment) Regulations, 2023
Draft amendmentReleased with the notice dated 5 Aug 2023No. MERC/Tech/Regulation/___. dated ___August 2023
Draft
A proposal that has since been finalised as the Distribution Open Access Regulations, 2016 — Second Amendment, 2023.
Summary
Summary written by software. Check the regulator's original before you rely on it.
Draft notification of the Maharashtra Electricity Regulatory Commission proposing the Second Amendment to the MERC (Distribution Open Access) Regulations, 2016, read with the 2019 First Amendment (together, 'the Principal Regulations'). The preamble (p1) explains the trigger: sectoral developments, specifically the Ministry of Power's First and Second Amendments to the Electricity (Promoting Renewable Energy Through Green Energy Open Access) Rules, 2022, which the draft says have been carried into the 2023 amendment. It is made under sections 61 and 86(3) read with section 181 of the Electricity Act, 2003 and clause 5.3 of the Tariff Policy, 2016; the notification number and the day of the August 2023 date are blank, and commencement is tied to Gazette publication (p1, p5).
The draft first amends the definitions in Regulation 2 of the Principal Regulations (p2): it adds 'Central Nodal Agency', an 'Entity' definition keyed to a threshold of "Hundred kW or more" of contract demand or sanctioned load including through multiple connections in the same division (with no load limit for captive consumers), a 'Forum of Regulators' reference, a substituted 'Renewable Energy'/'Green energy' definition covering hydro, storage using renewable energy and green hydrogen/ammonia mechanisms, and a definition of 'Rules' pointing to the 2022 central Rules and their amendments.
The eligibility provisions of Regulation 3 are then rewritten (pp2–3): the second and eighth provisos to Regulation 3.2 are deleted, and new Regulations 3.3 and 3.4 open green energy open access to consumers at "100 kW or more" or any threshold later set in the Rules, remove the capacity ceiling for captive consumers and for renewable-sourced open access (subject to the power-flow conditions in Regulation 8.10), require advance intimation of the share of renewable generation allotted to each of multiple connections, freeze the quantum drawn for at least twelve time blocks, and let rooftop renewable consumers take open access simultaneously.
Regulation 4 gains a proviso requiring green energy open access applications to follow the Central Nodal Agency's procedures and formats (p3). Regulation 8 gains three provisos allocating nodal-agency duties — the State Load Despatch Centre for short-term and the State Transmission Utility for medium/long-term green open access — and obliging the distribution licensee to furnish the data the nodal agency needs to meet central timelines (pp3–4).
Regulation 14 is amended (p4) with a protection capping increases in cross-subsidy surcharge for renewable-based green open access consumers over a twelve-year window from plant operation, and with exemptions from cross-subsidy surcharge and additional surcharge for non-fossil waste-to-energy supply, for green energy used to make green hydrogen and green ammonia, and (for additional surcharge) for offshore wind commissioned up to December, 2032. Regulation 17 is amended to allow green energy open access for consumers below 1 MW contract demand on a ToD-meter basis (p5). Regulation 20 is substituted (p5): banking charges are to be adjusted in kind at a fixed percentage of energy banked, and un-utilised surplus banked energy lapses at the end of each banking cycle, with the renewable generator entitled to Renewable Energy Certificates for the lapsed energy.
Read with this
The regulation
- Dated 30 Mar 2016Distribution Open Access Regulations, 2016
Amendments and corrections
Commencement notices and reasons
- Dated 30 Mar 2016Distribution and Transmission Open Access Regulations, 2016 — Statement of Reasons
- Dated 3 Jun 2019Distribution and Transmission Open Access Regulations, 2016 — First Amendment, 2019 — Statement of Reasons
- Dated 10 Nov 2023Distribution Open Access (Second Amendment) Regulations, 2023 — Statement of Reasons
Other copies of these documents (1)
- Dated 30 Mar 2016Distribution Open Access Regulations, 2016
Proposed changes (drafts with no final yet)
- Released with the explanatory memorandum dated 22 Sep 2026Distribution Open Access Regulations, 2026 — Draft
Earlier drafts
- Released with the notice dated 5 Aug 2023Explanatory memorandum: Draft Distribution Open Access (Second Amendment) Regulations, 2023 — Explanatory Memorandum
5 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft, 2 drafts or notices on a draft not held as English text and 1 copy in another language.
Voltaic last read MERC's website for final documents on 28 Nov 2026 (8 pages) and for drafts on 28 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.