HPERC · Himachal Pradesh Electricity Regulatory Commission
Hydro Generation Tariff Regulations, 2011 — Third Amendment, 2018 — Draft
Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Hydro Generation Tariff) (Third Amendment) Regulations, 2018
Draft amendmentDated 8 Oct 2018No. HPERC-F(1)-2/2018 dated 08th October, 2018
Draft
A proposal that has since been finalised as the Hydro Generation Tariff Regulations, 2011 — Third Amendment, 2018.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft amendment to Himachal Pradesh's hydro generation tariff regulations, issued by HPERC at Shimla as Notification No. HPERC-F(1)-2/2018 and published for objections rather than brought into force by the notification itself. The preamble (p1–2) records why the amendment is thought necessary — alignment with the National Tariff Policy, 2016, adoption of the central Commission's methodologies, changes in HPERC's 2014 regulatory-accounting and 2015 terminal-benefits regulations, a shift from base-rate to MCLR-linked interest, and removal of gaps and discrepancies — and gives affected persons 21 days from Rajpatra publication to file objections with the Secretary.
The draft text (p2–8) then rewrites specific provisions of the HPERC (Terms and Conditions for Determination of Hydro Generation Tariff) Regulations, 2011, to be called the Third Amendment Regulations, 2018 and to commence on publication. Draft regulation 2 amends the definitional regulation 3, inserting or substituting definitions of accounting statements, change in law, force majeure event, MCLR and prudence check and updating the residual-definition clause (p2–3).
Draft regulation 3 inserts a new regulation 9-A on carrying cost for true-up amounts; regulation 4 substitutes regulation 10 on refund of excess tariff recovery with interest; regulation 5 inserts regulations 10-A to 10-C requiring an accounting manual, annual regulatory audited accounts, plant-wise segregation of accounts, and treatment of consumer contribution, deposit works, grants and capital subsidy in capital cost (p4–5).
Regulation 6 amends regulation 13(2), listing the grounds on which the Commission may admit capital expenditure incurred after the cut-off date subject to prudence check, and excluding minor assets (p5–6). Regulation 7 amends regulation 17 on interest on loan — how the rate is computed, the fallback where there is no actual loan, and sharing of refinancing benefits between beneficiaries and the generating company — while regulation 8 substitutes regulation 19 on interest on working capital (p6–7). Regulation 9 substitutes regulation 20(2) on salvage and depreciable value, with hydro-specific provisos, and regulation 10 replaces regulation 22(2)–(4) on operation and maintenance expenses with norms keyed to a station's operating history as on 31 March 2018, adding a sub-regulation on sharing of terminal benefits (p7–8).
Read with this
The regulation
- Dated 1 Apr 2011Hydro Generation Tariff Regulations, 2011
Amendments and corrections
- Dated 30 Jul 2011Hydro Generation Tariff (First Amendment) Regulations, 2011
- Dated 1 Nov 2013Hydro Generation Tariff Regulations, 2011 — Second Amendment, 2013
- Dated 22 Nov 2018Hydro Generation Tariff Regulations, 2011 — Third Amendment, 2018
Commencement notices and reasons
Procedures and orders made under it
- Dated 2 Apr 2011Multi Year Control Period Notification for the Generating Company, 2011
- Dated 2 Apr 2011Formats for Multi Year Tariff Filings by the Generating Company Order, 2011
- Dated 30 Nov 2016MYT Generation Formats
- Dated 30 Nov 2016Index of Formats
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.